ExRes
Established Member
Paul Clifton (BBC South transport) has said on his twitter it's expected to cost £15m to make each unit AC able. That's a staggering amount!
Well it is April 1st
Paul Clifton (BBC South transport) has said on his twitter it's expected to cost £15m to make each unit AC able. That's a staggering amount!
Paul Clifton (BBC South transport) has said on his twitter it's expected to cost £15m to make each unit AC able. That's a staggering amount!
Each unit would have cost less than £15m to build.
Each unit would have cost less than £15m to build.
As i wrote earlier in this thread the 707s are relatively underpowered (less of an issue given 3rd rail infrastructure and older stock is the limit on SWT)...
Well, speaking as an East Midlander, I think this whole thing is is just scandalous.
Up here in the real world, where the only "new" stock we get for local services is about 30 years old, I can't believe this. You lot in the south live in some kind of parallel universe to the rest of us.
Were they underspecced because of the power limitations?
Each 707 cost £7.0m.
£7.0m for a 5-car unit is pretty cheap, which kind of confirms that the low spec was cost-driven. That First/MTR can get a better deal on higher-specced stock rather suggests that the ROSCO was raking it in; or to put it another way; they had fully costed in the risk of not having a section 54.
What's a section 54? Is some kind of "get out" clause?
£7.0m for a 5-car unit is pretty cheap, which kind of confirms that the low spec was cost-driven. That First/MTR can get a better deal on higher-specced stock rather suggests that the ROSCO was raking it in; or to put it another way; they had fully costed in the risk of not having a section 54.
The 700 (Desiro City) architecture seems to be built round cars which have either all axles motored or none. So the 707 has two fully motored cars and three trailers. I doubt you could add an extra pair of traction motors. What might be possible as part of a deal with Siemens is to replace one of the trailer cars with a fully motored one, using the same motor sizes - you would then have a unit with 60% motored axles and 1.8MW at the wheel, which should up the performance to somewhere about the same as a 700. The cost would depend on how close to the bone the original design for cabling etc was. And of course it wouldn't be a 707 any more - so a new design of rolling stock as quoted. First has had a good relationship with Siemens in the past (Class 185; Class 380...). I am sure this will have been considered as one of the options. Whether it gets chosen depends on whether someone else has offered a better deal.
it would make perfect sense for these to replace Southerns 455s.
I take it then that it's not excessively difficult to swap between the two traction motor types?
Apart from being too long for most via Tulse Hill service platforms...
Or lengthen the easy platforms and SDO on the rest![]()
And the fact that there are only 30 of them.
But post internal cascade with more 377s replacing 455s less than 30 units would be needed to replace 455s with new high utilisation stock - the GTR rolling stock plan is to use the 455s far less intensively as they are expected to decline in reliability. As few as 20 units might be required to replace 455s post 2018.
Is this going to be when they get the 377/5's back?
Apart from being too long for most via Tulse Hill service platforms...
Or lengthen the easy platforms and SDO on the rest
(or Palace, Gipsy Hill, Selhurst, , Thornton Heath, Norbury, Streatham Common passengers get a more comfortable journey to London Bridge!)
the internal cascade of more 3car 377/s should help increase the number of 10 car services on 10 car routes
Is this going to be when they get the 377/5's back?
The amount wouldn't be small. Firstly Siemens would have to produce more units in the short term to allow the units to be cycled through refurb while still achieving the required availability. Secondly, the refurb would not be cheap or quick: there's toilets, changes to layout, upgraded IT and it seems improvements to power are needed. And at the end their income would be lower than it is now! That looks a fairly hefty bath to me.
And where will you get these magical 10-car length depot facilities? I thought that the 707s were specced like that because 5-car was the absolute limit on stock length?If Siemens win the tender I'd expect them to manufacture new motor and trailer coaches with toilets to add to the existing 30 x 5 car trains making 30 x 10 car trains now with toilets and 4 (or even 5) coaches powered. Hey presto - 10 car suburban, high-powered metro trains. This way they wouldn't need to change anything on the current 707s, just add what's missing from the SWT spec.
Copy and paste the above to make the rest of the fleet up to 750 vehicles.