Future of Class 379

Status
Not open for further replies.

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,578
Location
Northampton
379s are just as capable of being modified for ETCS as 387s though, there is nothing fundamental stopping it from being fitted.

That's just an excuse trotted out by people who - for whatever reason - refuse to accept the possibility that more stock is needed.
But somebody has to pay for it.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Southern Dvr

Member
Joined
13 Oct 2010
Messages
991
Although in this case leasing the stock to GTR certainly wouldn't result in shipping fresh air, as you put it.
It’s a self fulfilling prophecy, the trains aren’t empty. People are travelling. Numbers won’t grow at a decent rate if the railway is uninviting.

As for the protection during the pandemic, if the government had actually done something instead of partying the night away they could have worked a sensible plan to protect the railways then and save money.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
Also what costs of modifications? 379s need work on them because they've been out of use for ages not because they are fundamentally unsuitable for use on GN.
In any case the cost of making them operational again would be on Akiem not the DFT.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,345
In any case the cost of making them operational again would be on Akiem not the DFT.
Yes, although then wrapped up into the lease cost of units which are speculated to already be too expensive to lease.
 

theblackwatch

Established Member
Joined
15 Feb 2006
Messages
10,889
Can anyone confirm which sets are still at Harwich please? By my reckoning it's 006/008/021/025/026 - but I may of course be wrong!
 

03_179

Established Member
Joined
13 Aug 2008
Messages
3,862
Location
At my desk
Can anyone fill in the unknown locations please.
I've lost touch with moves etc. but the dates listed are what is on an internal system.
UnitLocation
379001Ilford 26/04/2023
379002Ilford 14/04/2023
379003Unknown
379004Unknown
379005Unknown
379006Unknown
379007Unknown
379008Unknown
379009Worksop up Recp 14/04/2023
379010Unknown
379011Ilford 26/04/2023
379012Unknown
379013Unknown
379014Unknown
379015Unknown
379016Ilford 26/04/2023
379017Unknown
379018Ilford 25/04/2023
379019Unknown
379020Unknown
379021Ilford 18/04/2023
379022Unknown
379023Ilford 18/04/2023
379024Unknown
379025Unknown
379026Unknown
379027Worksop Up Recp 14/04/2023
379028Ilford 25/04/2023
379029Unknown
379030Unknown
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,281
Can anyone fill in the unknown locations please.
I've lost touch with moves etc. but the dates listed are what is on an internal system.
I don’t know the answer, but there’s just been an offer of an updated location list next week, in the other 379 thread in the rolling stock forum...
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,156
Location
West Wiltshire
Rumour has it that GTR are looking to source some EMU stock for Great Northern.

Not a rumour, there is a tender which is being discussed in this thread

 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,845
Discussed here. https://www.railforums.co.uk/threads/great-northern-fleet-tender.247756/#post-6195120

They are looking to renew the lease on most or all of 387101-387129. It looks like the only role of the 379s in the tender is to keep Porterbrook's price for the 387s keen.
Except that the National Rail Contract for TSGN shows the lease on the 387/1s expiring on 31 March 2028: https://assets.publishing.service.g...ilway-limited-2022-national-rail-contract.pdf
(Image below of relevant table from the contract document showing 387 lease end dates)
1682850367813.png

There lots of possible options for why this tender has been published as the cascade alternatives are numerous. Could there be an intent to (finally) cancel the Class 701 order and this is a way of getting stock in to release 707s back to SWR?

Of course, it might not be the 379s that are a given for any extra stock: Porterbrook can offer 350/2s - indeed you could use the 37x350/2s to release all the 387s on GN, thus making the GN (and Hornsey depot) a completely Siemens operation.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,345
There lots of possible options for why this tender has been published as the cascade alternatives are numerous.
OK, but previous postings have indicated that 387s are the right rolling stock for GN services because of the ease of installing the equipment for ETCS operation. This seems believable.

It is also known that the railway's finances are finite, and both staff training and the lease costs of additional units represent more costs that can only be met by a higher expense from the Treasury.

A 379 > 387 > 377 > 465 > 707 > 455 cascade seems a bit too complex to deliver.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
OK, but previous postings have indicated that 387s are the right rolling stock for GN services because of the ease of installing the equipment for ETCS operation. This seems believable.
Its not that different to installing on the 379s. The fitment to the GN 387s would be using different ETCS equipment to the HX ones.
It is also known that the railway's finances are finite, and both staff training and the lease costs of additional units represent more costs that can only be met by a higher expense from the Treasury.
Its a tender for additional stock, the leases on current stock don't end till 2028. Clearly the DfT think they can find some money.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,187
Its not that different to installing on the 379s. The fitment to the GN 387s would be using different ETCS equipment to the HX ones.
Yep, the Bombardier ETCS (as per 387/1a) is no longer being fitted.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,845
How would that one work?
(say) 379 to GN > 387 to Southern > 377 to South Eastern > 465s release 707s > 707s back to SWR. They would have to retain the 455s as well, obviously, pending a decision on how to replace them.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
Except that the National Rail Contract for TSGN shows the lease on the 387/1s expiring on 31 March 2028: https://assets.publishing.service.g...ilway-limited-2022-national-rail-contract.pdf
(Image below of relevant table from the contract document showing 387 lease end dates)
View attachment 134127

There lots of possible options for why this tender has been published as the cascade alternatives are numerous. Could there be an intent to (finally) cancel the Class 701 order and this is a way of getting stock in to release 707s back to SWR?

Of course, it might not be the 379s that are a given for any extra stock: Porterbrook can offer 350/2s - indeed you could use the 37x350/2s to release all the 387s on GN, thus making the GN (and Hornsey depot) a completely Siemens operation.
What do you do about the class 171, 377/2, 377/3 and class 700 units all of which have a scheduled lease expiry of 31st March 2028.

I notice that class class 717 only runs until 30th September 2023. Does that mean that GTR should be looking for replacements for the class 717 units?

I have not fully read the PDF https://assets.publishing.service.g...ilway-limited-2022-national-rail-contract.pdf but I would be surprised if there is not an automatic renewal of the lease for the class 717 units for at least another 5 years and the same with the class 377/378 units when expiry comes up in 2028.

I also suspect that the class 701 units will enter revenue service this year and with half the fleet now having been built, i think it would be more costly to cancel the order than to see the class 701 enter revenue service. Hence, I do not see the class 707 units going back to SWR. I still expect that by the end of the year that the class 707 units with SWR will go to South Eastern.

379 > 387 > 377 > 465 > 707 > 455

Whilst the class 379's might replace the class 387's with Great Northern and so the 387's then go to Southern, which releases class 377 units to South Eastern, I do not see class 465 replacing class 707 units at South Eastern and I also do not see class 707 units replacing class 455 units at SWR. In fact I would say that it will be class 701 units that replace class 455 units as originally planned.

What nobody is thinking about in the replacement process starting with the class 379 above,, is what is to happen with the class 458 units? What is the expiry date for the lease on the class 444/450 with SWR?
 

43102EMR

Established Member
Joined
28 Mar 2021
Messages
1,373
Location
UK
Whilst the class 379's might replace the class 387's with Great Northern and so the 387's then go to Southern, which releases class 377 units to South Eastern, I do not see class 465 replacing class 707 units at South Eastern and I also do not see class 707 units replacing class 455 units at SWR. In fact I would say that it will be class 701 units that replace class 455 units as originally planned.
If anything, it will just cause an internal cascade within GTR to prevent shortforms - that is if it does happen.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,845
I also suspect that the class 701 units will enter revenue service this year and with half the fleet now having been built, i think it would be more costly to cancel the order than to see the class 701 enter revenue service. Hence, I do not see the class 707 units going back to SWR. I still expect that by the end of the year that the class 707 units with SWR will go to South Eastern.
It doesn't matter if half the trains have been built or not - if they are not up to scratch then there is the possibility that the order is cancelled. The problem then is Alstom's as the builder of such dross. Given that the whole fleet was due in service by December 2020 and that none have entered service so far, I'd say SWR and DfT would be quite within their rights to cancel the order. Incidentally this is exactly what ÖBB has done with the Talent 3 fleet ordered from Bombardier (yes, them again) - they've placed a contract with Siemens for more Desiro ML sets instead.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
What do you do about the class 171, 377/2, 377/3 and class 700 units all of which have a scheduled lease expiry of 31st March 2028.
Nothing for now? They'll negotiate a new/longer lease in a few years time.
Preventing shortforms doesn't justify spending multi millions on train leases.
Leasing adequate rolling stock to deliver the service to the public is a bad spend of money? As they've put the tender out they obviously think they can find enough money to pay for it.
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,128
Location
Liverpool
Nothing for now? They'll negotiate a new/longer lease in a few years time.
Or scrap without replacement in the case of the 171s, since diesels will be politically unacceptable around that time, but buying new stock will still be off the table.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Or scrap without replacement in the case of the 171s, since diesels will be politically unacceptable around that time, but buying new stock will still be off the table.
Umm no? Getting rid of popular Marshlink and Uckfield services would be more politically unacceptable. The future of those lines is battery or electrification.
 