Jozhua
Established Member
- Joined
- 6 Jan 2019
- Messages
- 1,891
When I've done the maths on the back of a fag packet, if you assume a half hourly Nottingham and a half hourly Sheffield service (i.e. similar to now) plus around ten percent of trains spare for "maintenance" (etc) then you should have enough AT300s for about half of all diagrams to be doubled up - given that a number of services through Leicester are four/five coach Meridians at the moment, a one hundred and twenty metre long train (that doesn't have the over-provision of First Class that the 222s currently have) should be fine for a lot of departures.
Okay, cool! Makes sense, should give a reasonable boost to capacity then.
I still think the provision for growth and fixing current shortfalls in capacity isn't absolutely massive, but placing more orders shouldn't be too hard, however unlikely.
With a solid refurb, retaining a small fleet of 222's could really give EMR a lot more flexibility and capacity, especially in times of disruption.

