quantinghome
Established Member
- Joined
- 1 Jun 2013
- Messages
- 2,843
For what it's worth, here is an extract from a TfN report from August 2024 proposing a "Leeds Area Task Force":
mods note - split from this thread
In other words, there are a whole heap of programmes and schemes to fulfil those programmes, and it could become a massively convoluted mess between TfN / DfT / NR if they're not careful. Make of it what you will!
mods note - split from this thread
Converging Programmes
The West Yorkshire area features at the heart of several programmes, including:
- Transpennine Route Upgrade (TRU)
- Northern Powerhouse Rail (NPR) including Leeds – Bradford electrification
- Network North (incl. Leeds – Sheffield, Leeds - Hull)
It is also significantly impacted upon by other programmes, including:
- East Coast Mainline upgrades
- Manchester and North West Transformation Programme (MNTP)
There are significant local schemes in development and delivery which must be considered, including:
- West Yorkshire Mass Transit
- Leeds station approach
There are studies in development which will identify enhancement requirements which are expected to place further demand upon Leeds, including:
- Midlands, Yorkshire and the North East (MYNE) study
- 5 Towns Strategic Advice
Train operators are investing, introducing new rolling stock to boost capacity and decarbonise their fleets
- Northern Class 15X rolling stock replacement
- TransPennine Express new trains
- LNER tri-mode trains
The Leeds Area Improvement Plan (LAIP) is delivering schemes which support these major programmes, and is in and of itself a significant undertaking. It seeks to address the gaps between the various infrastructure schemes, and act as an enabler for benefits realisation. Scope includes:
- LAIP 1, delivering the extension of Platform 17 to support capacity improvements to Sheffield, Lincoln and Nottingham.
- LAIP 2, delivering platform extension works at Bradford Forster Square along with power supply upgrades in the area to enable longer Northern trains to operate, and facilitate the introduction of additional LNER services to London.
- LAIP 3 and 4, addressing performance and capacity challenges in the Leeds area, with the scope of intervention under review.
- Line G, providing additional capacity in the station throat for services accessing Platform 17.
- Leeds North West Platform Extensions, facilitating the operation of 6-car Northern services on the Airedale and Wharfedale lines.
Additionally, the Leeds Existing Station Programme (LESP) is working to increase capacity within the station to cater for an uplift in demand as a result of the service improvements facilitated by the above investment programmes. This in itself is a complex multimillion-pound project.
In other words, there are a whole heap of programmes and schemes to fulfil those programmes, and it could become a massively convoluted mess between TfN / DfT / NR if they're not careful. Make of it what you will!
Last edited by a moderator:
