Intending to make a journey on this line at the end of next week and I've just had a notification of rail replacement, which seems to be over about 4 days. Nothing about it on nationalrail.co.uk or the Northern site, and it's odd for it to be at such short notice (aside from immediately of course if the line had flooded again).

Out of interest is this...
1. Repairing things that were damaged due to the floods?
2. A mistake in the timetable and will change back?
3. Something else, if so what?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,662
Intending to make a journey on this line at the end of next week and I've just had a notification of rail replacement, which seems to be over about 4 days. Nothing about it on nationalrail.co.uk or the Northern site, and it's odd for it to be at such short notice (aside from immediately of course if the line had flooded again).

Out of interest is this...
1. Repairing things that were damaged due to the floods?
2. A mistake in the timetable and will change back?
3. Something else, if so what?
Fixing the slip at Ulverston.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,135
Location
"Marston Vale mafia"
Fixing the slip at Ulverston.

Thanks, so I guess what was done was just a temporary measure to get trains running again.

Annoying but can't be helped I guess. Interestingly I found out about it via an automatic notification from Trainsplit, but that notification told me I had to travel an hour earlier (which I can't) - there is actually a RRB departing at my original planned time, just arriving quite a bit later (the lay of the land round there means RRBs take about an hour longer than the train). Odd that it automatically assumes you want to travel earlier rather than arrive later, you'd think the automated system would identify both options.
 

JRT

Member
Joined
11 Nov 2020
Messages
385
Location
Bradford
Thanks, so I guess what was done was just a temporary measure to get trains running again.

Annoying but can't be helped I guess. Interestingly I found out about it via an automatic notification from Trainsplit, but that notification told me I had to travel an hour earlier (which I can't) - there is actually a RRB departing at my original planned time, just arriving quite a bit later (the lay of the land round there means RRBs take about an hour longer than the train). Odd that it automatically assumes you want to travel earlier rather than arrive later, you'd think the automated system would identify both options.
Most RRB times are based on arrival at the ultimate destination at the same time, so the software assumes you want to get there at your usual time.
Delay repay/advance tickets seems to work the other way round, assuming you want to set off at your usual time.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,194
Intending to make a journey on this line at the end of next week and I've just had a notification of rail replacement, which seems to be over about 4 days. Nothing about it on nationalrail.co.uk or the Northern site, and it's odd for it to be at such short notice (aside from immediately of course if the line had flooded again).
This, maybe...


Extract...
National Rail said:
Buses replace trains between Lancaster and Barrow-in-Furness from Tuesday 3 to Thursday 5 December

Route(s) affected

Between Manchester Airport / Preston / Carlisle and Barrow-in-Furness, and also between Lancaster and Carlisle
Description
Engineering work is taking place in the Ulverston area, closing all lines.

As a result, buses will replace train services between Lancaster and Barrow-in-Furness from the start of service Tuesday until the end of service Thursday.

And this...


Extract...
Northern said:
Ulverston engineering 2024
Engineering works between Lancaster-Barrow (3-5 DEC)


There will be no trains between Lancaster and Barrow-In-Furness between Tuesday and Thursday inclusive next week while essential repairs are carried out in Ulverston.
Network Rail engineers have been working around the clock this week to repair damage to caused by flooding during Storm Bert.
 
Joined
3 Mar 2020
Messages
672
Location
Furness
Looks like the trainsplit got the information out before the Network Rail embargo or whatever they do as you suggested. It wasn't on the Northern website when I looked at trains through Ulverston on Tuesday

The drone footage shows they have been busy building a water slide of sorts since the line temporary fix .
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,194
Is this BBC news story correct? "From Monday to Friday" makes it seem as if the (Furness) line is shut all week. :s


Extract...
BBC said:
A train line is set to close again for essential repairs following Storm Bert flooding.

No trains will run between Barrow-in-Furness in Cumbria and Lancaster from Monday to Friday as urgent works are to be carried out in the Ulverston area
 
Joined
3 Mar 2020
Messages
672
Location
Furness
I checked last last Friday intending to travel Tuesday (tomorrow) and it was clear it was Tuesday to Thursday closure. Don't know where that info has been plucked from.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,194
BBC website seems to have been tweaked/updated today. Certainly a through rail service between Barrow and Lancaster running today, quite a few track workers doing some preparatory work at the affected location, just West of Ulverston. Full line possession tomorrow?
 