The Planner
Veteran Member
- Joined
- 15 Apr 2008
- Messages
- 19,700
A block of this size would have had a seperate piece of timetabling work done on it. Not a chance would this have been submitted as a normal STP bid with NR then offering back in normal timescales, its too big. The traffic remarks would not be the be all and end all.I disagree with the last part of your reply, traffic remarks usually form the basis of TOC/FOC amended timetable planning, particularly for major possessions on this scale. They’re also a contractual record of what has been agreed. If processes have deteriorated so that this is no longer reliably the case, then I would be extremely concerned.