rail-britain
Established Member
- Joined
- 12 Aug 2007
- Messages
- 4,102
With all this talk over Mark 3 coaches...
I've now heard two rumours from normally reliable sources
ScotRail are currently inspecting 16 Mark 3 coaches for use on the Caledonian Sleeper from the end of 2008, to replace the Mark 2 coaches
Engineers have already visited all the stations to carry out measurements to make sure the trains will fit
Ironically, in the past not all the sleepers fitted into stations en-route, but apparently this is now an issue!
I've now heard two rumours from normally reliable sources
ScotRail are currently inspecting 16 Mark 3 coaches for use on the Caledonian Sleeper from the end of 2008, to replace the Mark 2 coaches
Engineers have already visited all the stations to carry out measurements to make sure the trains will fit
Ironically, in the past not all the sleepers fitted into stations en-route, but apparently this is now an issue!