• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Freight Train Unable to Enter Sidings

Status
Not open for further replies.

Chrisgr31

Established Member
Joined
2 Aug 2011
Messages
1,704
South Eastern tweeted yesterday https://twitter.com/Se_Railway/status/992914074299183104
Hastings bound trains are being delayed at #Robertsbridge because of a freight train being unable to enter the sidings between Robertsbridge and Battle. A member of staff is on the way to allow the freight train to enter the sidings
that trains were being held up as a freight train was unable to enter sidings and a member of staff was on the way to enable it to do so.

So what member of staff would be required? Guessing it was some form of programming foul up as you'd have thought someone would have an idea when a freight train would need to enter sidings?
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mag_seven

Forum Staff
Staff Member
Global Moderator
Joined
1 Sep 2014
Messages
11,972
Location
here to eternity
South Eastern tweeted yesterday https://twitter.com/Se_Railway/status/992914074299183104 that trains were being held up as a freight train was unable to enter sidings and a member of staff was on the way to enable it to do so.

So what member of staff would be required? Guessing it was some form of programming foul up as you'd have thought someone would have an idea when a freight train would need to enter sidings?

Possibly someone required to operate a Ground Frame (i.e. manually operate a set of points at the entrance to the sidings)
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,555
Location
Somewhere
A lot of places across the network require a release or acceptance button/switch to be given to enable the signaller to signal the train in. Usually the job of ground staff but if they are delayed or not been rostered that will cause such issues.
 

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906
Ground Staff needed could have been 'missed' on a roster, had an accident en route, taken ill unable to attend.......
 

tsr

Established Member
Joined
15 Nov 2011
Messages
7,400
Location
Between the parallel lines
In the end the ground staff had to be resourced from Tonbridge. This caused delays of up to an hour for passenger trains. It's lucky there were staff that close (and spare) at that time of day, too.

It keeps happening at the Crawley Aggregates yard as well - with alarming regularity, though not normally with such severe delays.
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,555
Location
Somewhere
The original shunter in this case was contracted out to a third party who never actually turned up.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,637
Location
Nottingham
Wasn't there anywhere the train could have continued on to to get it off the main line if it couldn't get into the siding? I seem to remember hearing of at least one working instruction where the signaller had to phone a particular siding to make sure there was someone present, before the train serving the siding set out towards it.
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,933
Wasn't there anywhere the train could have continued on to to get it off the main line if it couldn't get into the siding? I seem to remember hearing of at least one working instruction where the signaller had to phone a particular siding to make sure there was someone present, before the train serving the siding set out towards it.
In this case, the driver possibly wouldn’t have signed the route beyond there.

It’s certainly not unknown for to be an instruction, even if unwritten, requiring the signalman to check before letting the train pass the last regulating point. We used to do it (I’m sure they still do!) at Langham for trains towards Ward’s sidings at Ketton - in that case, the train could continue to Peterborough if necessary, because that’s the way they go out anyway. I’m sure it wouldn’t be the first time! It’d be a pain because it’d have to run round there and go back to at least Melton but probably Leicester to run round again before having a second attempt.

A slight variation, but on the Down, Melton (or Oakham on Sundays!) had to check that the reception line at Mountsorrel was clear before running anything needing to go in there. I’m sure the same applies between Derby and Saltley (as was) for trains for Kingsbury passing Elford loop.
 

Joe Paxton

Established Member
Joined
12 Jan 2017
Messages
2,959
In the end the ground staff had to be resourced from Tonbridge. This caused delays of up to an hour for passenger trains. It's lucky there were staff that close (and spare) at that time of day, too.

It keeps happening at the Crawley Aggregates yard as well - with alarming regularity, though not normally with such severe delays.

I guess that could be the basis for one argument in favour of an integrated train/track railway.
 

jdxn

Member
Joined
2 Nov 2017
Messages
68
I guess that could be the basis for one argument in favour of an integrated train/track railway.

No - not at all! What has that got to do with it? Even if it was all 'New British Rail' the shunter could have been ill/not rostered/delayed. It's about the operational issues that allow a train to be sent past the last loop (point of no return) without knowing it can be accepted.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,637
Location
Nottingham
No - not at all! What has that got to do with it? Even if it was all 'New British Rail' the shunter could have been ill/not rostered/delayed. It's about the operational issues that allow a train to be sent past the last loop (point of no return) without knowing it can be accepted.
Indeed. The example I mentioned would have been back in BR days.
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,555
Location
Somewhere
Wasn't there anywhere the train could have continued on to to get it off the main line if it couldn't get into the siding? I seem to remember hearing of at least one working instruction where the signaller had to phone a particular siding to make sure there was someone present, before the train serving the siding set out towards it.

This instruction exists where possible. I know services for Harlow Mill are either held in the down goods loop at Harlow Mill (or back at Broxbourne) or up services held at Bishop Stortford untill the shunter confirms his presence with the signaller.

With the train in question, it was indeed the Gypsum service and once on the move there is no where feasible to hold it.
 

greatkingrat

Established Member
Joined
20 Jan 2011
Messages
3,292
If you had to, you could hold the train at Tunbridge Wells as both platforms are bi-directional.
 
Status
Not open for further replies.

Top