Anyone know if any EMT 156s/158s are stuck the wrong side of the block?
I saw an image taken at Norwich earlier today of two 158s in the sidings there, so imagine they're trapped. One of the units is 158780, not sure about rear one.
Anyone know if any EMT 156s/158s are stuck the wrong side of the block?
I saw an image taken at Norwich earlier today of two 158s in the sidings there, so imagine they're trapped. One of the units is 158780, not sure about rear one.
6L37 Hoo Junction to Whitemoor (a Colas operated departmental working)Any idea what 688Y (just west of Ely station) is...?
It's heading back from Ely to Hoo Junction tonight as 6O36...as it's been sat there since yesterday!!!
This is the current info on NRE.I`ll be going through Sunday night Norwich to Manchester, hope its cleared by then
An initial estimate from Network Rail is for the line to reopen on Monday 21 August. This date is subject to change and you are advised to check before travelling.
I saw an image taken at Norwich earlier today of two 158s in the sidings there, so imagine they're trapped. One of the units is 158780, not sure about rear one.
Always handy having spare 158s in the Jubilee sidings for GA to spot hire & timed nicely for Cromer Carnival.
Something will need to help cover for 170270 which is trapped north of the derailment.
6L37 Hoo Junction to Whitemoor (a Colas operated departmental working)
It's heading back from Ely to Hoo Junction tonight as 6O36
MARK
Steve Hooker from Network Rail (Head of Maintenance Delivery) was on the local BBC East (west) News last night - iPlayer link, view from 08:55 onwards (it's only available for another 15 hours).
He was suggesting that since passenger trains have more sophisticated suspension (than freight trains) they would have been very much less likely to have derailed. So does this imply a track problem that was beyond the capability of the wagon suspension to deal with? It seemed an odd comment to make when immediately afterwards he said that NR was extremely keen to find out what happened i.e. that they didn't know at present.
There have been several derailments over the last few years where a track twist fault combined with uneven loading of the wheels on a wagon caused either by twisted frames or by uneven loading of the wagon or containers. Either fault on its own was within spec or not far outside but in combination they could cause a derailment. Passenger trains are unlikely to have this sort of uneven loading.
Something will need to help cover for 170270 which is trapped north of the derailment.
I think I spotted that one on RTT where it got to a point then ran back on itself, judging by the reporting locations and timings. Another freight did similar too I think
I'd like to see the containers weighed too as the number of over declared overweight is surprising...
170270 went via Hitchin today in the direction of Cambridge. As I write this it's between Hitchin and Letchworth.
Unusual to hear the sound of a commuter DMU in the platform at Hitchin, rarely if ever heard since the 1980s.
I'd like to see the containers weighed too as the number of over declared overweight is surprising...
How do you know the number overweight is surprising? Is the number published? Are axle loads routinely weighed in the same way hot axle boxes are detected? I have asked TOC colleagues but they are not in the freight sector. But we doubt if there is equipment on running lines to measure axle weight/wheel load.
I would like to know how much difference it makes to say a wagon full of sand dry v wet after heavy rain parked in a siding all night.
Wagons are being lifted off the track with a rail crane, as a major recovery operation gets underway at the site where a freight train derailed in Ely on Monday 14 August.
A rail crane was brought in overnight on Tuesday (15 August) so that work could begin to lift the 11 derailed wagons from the tracks. Each empty wagon weighs 11 tonnes, with the heaviest container including its contents weighing 106 tonnes and each one will be carefully lifted onto the undamaged track to be towed away. The train and the wagons that stayed on the track were towed away on Tuesday afternoon.
The recovery operation is expected to take a number of days and once complete, nearly ¼ mile of track needs to be replaced. The work is scheduled to complete over the weekend and the line is expected to be open on Monday. In the meantime, the line will remain closed and passengers are urged to check before they travel.
Simon Ancona, Network Rails chief operating officer for Anglia, said: We have an army of experts and specialist teams who are working day and night to remove the wagons as quickly as possible. Once they are out of the way we can replace the tracks, carry out the necessary repairs, reopen the line and get passengers on the move again. We expect to be able to reopen the line on Monday. Id like to thank passengers for their continued patience.
The incident affects CrossCountry, East Midlands Trains and Greater Anglia passengers. Passengers are advised to check how their journey may be affected with their train operator, or nationalrail.co.uk
Those numbers don't make much sense. To start with an empty FEA wagon is 21 tonnes not 11. Second, the plated weight for a 20ft or 40ft container is generally around the 31 ton mark.
Maximum load for an FEA is 61 tonnes.
I'd like to see the containers weighed too as the number of over declared overweight is surprising...
(from the NR press release)the heaviest container including its contents weighing 106 tonnes