Freight train derailment at Carrbridge

Status
Not open for further replies.

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
As an old Railwayman (who was an Area TRain Crew Manager many, many moons ago), I am flabbergasted to read about the failures to do running brake tests.

This is one of the basics of train driving, indeed it should be done once a train is taken into service irrespective of the weather.

I feel like commenting further but it would be inappropriate until the report is issued.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MrC

Member
Joined
20 Nov 2009
Messages
218
18.2 Running brake tests during snow
conditions......

I'm pretty sure it's not relevant in this particular case but I raised a Q with our management some time ago about dynamic brakes on modern units as a full service brake will only give a minimal air brake on all wheels unless you get WSP activity and the dynamic brake cuts out.

Which sort of makes the above rule potentially a bit less effective unless you get instructions to also disable the dynamic brake in snowy conditions.

(Note that we've been told that the service brake meets the requirement for the auto brake as specified in this rule)

I never did get an answer.
 

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
The important thing is to prove retardation, primarily through the risk of the brake rigging freezing or ice forming in the brake pipe and other parts of the brake system.

Provided you have retardation then you have a brake.
 

MrC

Member
Joined
20 Nov 2009
Messages
218
Provided you have retardation then you have a brake.
Obviously, but it may only be proving that the dynamic brake is working.

So when you start braking for a station and the dynamic brake cuts out, either as designed at low speed or because of a slide, then you can suddenly find yourself with a much poorer brake than you previously had because you've just started to use snow and/or ice affected brake gear which hasn't been used for some time.

This really raised it's head last Feb which was the first time we'd driven modern units in significant snow and I wasn't the only driver to comment on it.
 

SWT Driver

Member
Joined
29 Aug 2009
Messages
777
Location
The Twiglet Zone.
A Desiro on dynamic brake is good, however the slightest bit of slipping it drops out and the train uses the air/disc brakes; However I've found that the air/disc braking in snowy conditions isn't as good for some reason as it is in milder conditions.
 

MrC

Member
Joined
20 Nov 2009
Messages
218
but do you have the ability to switch out the dynamic ?
Yes, there's a switch conveniently placed behind your head. However in the absence of any instruction to use it a driver could have a problem if an incident occurred and it was found that the dynamic brake had been disabled.

I'd hoped to get this clarified after last year but I've yet to get an answer.
 

MrC

Member
Joined
20 Nov 2009
Messages
218
However I've found that the air/disc braking in snowy conditions isn't as good for some reason as it is in milder conditions.
Yup - I found this last year and things improved greatly if I did running brake tests without the dynamic brake.
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
1 Question.

What's the gradient profile between Mossend and Carstairs?

Well that's over 20 miles so I'll summarise:
Mossend, through Motherwell and Carluke to the highest point between Carluke and Lanark Jn is a climb of 125mtrs over 18miles
and then,
- drops 25mtrs in 1.5 miles (to cross a river) and after that is pretty much level for the 2.5 miles into Carstairs.
But there's some 30 & 40 speed limits at Carstairs, tho; on the loops, goods lines and wrong-road bi-di, before we think about coming to a stand.

So maybe not so very great a descent - your next question will prob be to ask which signal was at danger? But that, I can't help you with.
 

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
Yes, there's a switch conveniently placed behind your head. However in the absence of any instruction to use it a driver could have a problem if an incident occurred and it was found that the dynamic brake had been disabled.

I'd hoped to get this clarified after last year but I've yet to get an answer.
Common sense suggests that the pragmatic approach would be to disable it whilst carrying out the RBT. Then again Common Sense is not that easily found in the railway Industry these days.

In BR days of course it was instructed that the rheostatic as fitted was not to be relied upon for critical stops such as approaching buffer stops, etc.

The AC electrics had rheostatic braking which was blended out as the speed reduced. It would be worth checking with a 86 trained BR driver what happened with regards to that in snow, although the rheo only affected the loco rather than the train.
 

MrC

Member
Joined
20 Nov 2009
Messages
218
It would be worth checking with a 86 trained BR driver what happened with regards to that in snow, although the rheo only affected the loco rather than the train.
I think this scenario is covered by the rules as it states that the RBT must be carried out using the auto brake - which I assume for any loco hauled train would be the train brake. Obviously I'm up for correction here by anyone who signs locos :)
 

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
I think this scenario is covered by the rules as it states that the RBT must be carried out using the auto brake - which I assume for any loco hauled train would be the train brake. Obviously I'm up for correction here by anyone who signs locos :)
The rheostatic brake was blended in with the train brake but only operative on the loco, that is why an 86 can stop so quickly.
 

Old Timer

Established Member
Joined
24 Aug 2009
Messages
3,702
Location
On a plane somewhere at 35,000
Ah OK thanks for the update.
No worries although I don't know if the rheo is still in use.

You could always tell because if you look at an approaching 86 when it is braking, you will see a heat haze from the resistor banks coming out through the front cab roof grille which is why the 86s had them. The early electrics didn't so years and years ago you knew what was coming by the dark patch (or not) on the white cab roof :D:D:D ;);)

Very useful for us young spotters in those days !
 

Royston Vasey

Established Member
Joined
14 May 2008
Messages
2,992
Location
Cambridge
www.wnxx.com refers to the fate of 66048:
wnxx.com said:
66048 (now WFMU) has been left on site to await recovery - or dismantling on site if some of the recent speculation doing the rounds holds any water - at a later date.

I realise this is probably froth and nonsense, but I find it astonishing that it could even be suggested that what is (supposed to be) a lightly damaged loco could be uneconomic to repair. Think of all the scrapes 47s have had over the years and been repaired!

Anyone heard rumours about this, and why they might consider scrapping it there and then? Is the loco more severely damaged than first thought?
 

Inverness_App

Member
Joined
4 Jan 2010
Messages
22
Location
Inverness
if dbs were going to be scrapping it they would have cut it up and taken it out in bits in the past week. dbs are only leaving it on site just now because they want it out in one piece, to do this they need to get a bigger crane in which needs a new access built into the site which we reckon will take 3 or 4 weeks. before it derailed dbs spent thousands and thousands on this one, not just the new paint job but a whole new engine and wheel sets aswell.
 

djw1981

Established Member
Joined
10 Jul 2007
Messages
2,642
Location
Glasgow
The issue of access may well also rely on ground conditions. The crane needs to get close enough because as the reach of the crane increases, the maximum weight it can lift reduces.

There are issues with chhopping down too many trees and establishing landowner consent in planning all such operations, and since it is not affecting the operational railway, it can be removed in a more planned way.

Dismantling may refer to draining fuel tank and removing any loose components to reduce the weight which has to be lifted. Removing fuel also reduces the environmental impact of the lifting operation.
 

Inverness_App

Member
Joined
4 Jan 2010
Messages
22
Location
Inverness
Carrilion have got the contract for the access road into the station from the A9. Last week they did there test holes and started clearing the site. They are quoting 3 weeks for completing the job.
--- old post above --- --- new post below ---
Just seen this on bbc news site.

Brakes on a train that derailed in the Highlands had not performed as well as they should have the Rail Accident Investigation Branch (RAIB) has said.

The locomotive was travelling at about 60mph when it overshot a run-out, a short length of track designed to divert trains from Carrbridge station.

Six of the 10 flat bed wagons carrying containers the engine was pulling also derailed in the incident on 4 January.

The RAIB said the brakes and effects of bad weather were being investigated.

In a statement, the branch said: "The driver and a technician who was travelling with the train received minor injuries. Major damage was caused to the railway infrastructure.

"An initial review of the evidence suggests that the braking performance of the train was below that expected of a train of its type.

"The weather at the time was poor, with a layer of snow over the head of the rail, heavy falling snow and extreme freezing temperatures.

"This investigation will take into account any other instances of poor braking performance during extreme winter conditions."
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Well for these of you who want the full RAIB text:

Investigation into an accident involving a freight train at Carrbridge, Inverness-shire, on 4 January 2010

The RAIB is carrying out an investigation into an accident involving a freight train at Carrbridge, Inverness-shire. The train was formed by a class 66 locomotive and ten FKA type flat bed wagons carrying containers.

The accident occurred at around 16:03 hrs on 04 January 2010 when the freight train, 4N47, the 13:14 hrs service from Inverness to Mossend Yard, passed a red signal on the single line while approaching Carrbridge station and continued for another 500 metres before running into a loop and onto a short length of track designed to divert trains away from the station (this is known as a ‘run out’).

When still travelling at around 60 mph the locomotive and the first vehicle overshot the end of the run out and came to rest down the embankment, close to some houses, with the next five vehicles coming to rest at various angles across the loop and the main line. The last four vehicles did not derail.

The driver and a technician who was travelling with the train received minor injuries. Major damage was caused to the railway infrastructure.

An initial review of the evidence suggests that the braking performance of the train was below that expected of a train of its type.

The weather at the time was poor, with a layer of snow over the head of the rail, heavy falling snow and extreme freezing temperatures.

This investigation will take into account any other instances of poor braking performance during extreme winter conditions.
 

drover1

New Member
Joined
5 Oct 2007
Messages
3
This is the same place that a class 158 in passenger service came off the track a few years ago can anybody remember when?
 

A60K

Member
Joined
26 Jun 2008
Messages
1,030
Location
Kilburn
A 170 derailed at Moy a few years back I think, but I can't immediately remember a 158 derailment. If there was I don't think the cause of that is likely to have any relvance to this incident, given the RAIB's statement.
 

Metroland

Established Member
Joined
20 Jul 2005
Messages
3,212
Location
Midlands
The 170 derailment was a landslip. The Carrbridge accident was as a consequence of a cat A SPAD because of braking performance. The only relevance I guess is the weather has some part to play in either accident.

Laughably, Bob Crow and his merry men have made themselves look complete chumps and blamed track maintenance.

'Severe disruption caused by the icy weather on Britain’s railways has exposed the “dangerous gamble” of a plan to axe 1,500 maintenance jobs, a union has warned.

The National Union of Rail, Maritime and Transport Workers (RMT) said severe disruption, including the derailment of a Stobart freight train in Scotland, has highlighted the need for well-staffed maintenance crews.

An investigation is underway after the Stobart locomotive and wagons came off the track at Carrbridge, near Inverness, around 4pm on Monday.'

http://www.newsandstar.co.uk/news/f..._1_657095?referrerPath=/news_round-up_1_50001
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
Most on here are probably aware that the line re-opened a few days ago, albeit with significant speed restrictions, but as no-one has specifically posted that news, here's NRs statement:-

"Wednesday 13 Jan 2010 11:00

Services began operating again on the Inverness-Perth route yesterday morning after a week of extraordinary effort by railway engineers to remove a derailed freight train in Carrbridge during brutal weather.

Staff from Network Rail and DB Schenker worked around the clock in temperatures as low as minus 21ºC to remove the train. Simply accessing the site was a challenge due to over twelve inches of lying snow in the area.

Two rail cranes were eventually able to access the site along with two road cranes, however, the arctic conditions led to hydraulic fluid freezing and delaying the removal of the train. In addition, some minor damage to tracks also had to be fixed despite the track being covered by a layer of snow and ice. All six containers and wagons were removed over the weekend of 9/10 January, with track work and snow clearance completed on Monday.

A limited passenger service will operate for the rest of this week until signalling equipment damaged during the derailment can be repaired this weekend.

Services between Aberdeen and Inverness were also restored on Tuesday morning, with a full service operating.

David Simpson, Network Rail route director Scotland commented:
The weather over last month has presented an enormous and relentless challenge to our people across the rail network but the Highlands has seen more snow and lower temperatures than anywhere else in the country and I am full of admiration for the job our people have done across the region.

“The derailment at Carrbridge has been the biggest challenge we have faced over this period and I’m delighted to see the line opening again despite the horrendous conditions. Although this winter may still have more to throw at us, I think our resilience has been demonstrated throughout the last month and I’m proud to say that we’ve still managed to run 85% of scheduled services across Scotland
.” "
from www.networkrailmediacentre.co.uk