BBC Look North tonight (Yorks & Lincs) showed footage of construction of a temporary access road by cutting away the verges of a bridle path and filling in a ditch.
to get the recovery cranes in i should think
BBC Look North tonight (Yorks & Lincs) showed footage of construction of a temporary access road by cutting away the verges of a bridle path and filling in a ditch.
hock:
That is more than a simple derailment: it is a train wreck!
Back in the day - BR would have just tipped the lot over into the field and cleared the line. These are , of course , privately owned wagons .....in the case of the standard BR wagon so many existed (and they cost very little) - it was a prudent policy. I recall many similar derailments in South Wales where this happened. Many of the wagons were in poor overall condition - so dropped springs etc happened and caused carnage. Loaded wagons (coal) were dealt with by the local community.
One gathers the loco and first 9 or so tanks reained on the line and the rest went pretty well everywhere.
I heard it cost half a million pound for the crane alone. As you mention get in rail cranes - oh no we aren't a proper railway anymore...breakdown cranes don't benefit shareholders.Get the breakdown train and breakdown crane out get the stuff shifted used to be the way, now its build a road and get in a huge crane at god knows what cost because we have had to pull it off another job or be brought in from miles away. The cost must running into £ ? just to move a few tanks and clear up the mess and who,s going to foot the bill I wonder?
How times have changed and not for the better.
I heard it cost half a million pound for the crane alone. As you mention get in rail cranes - oh no we aren't a proper railway anymore...breakdown cranes don't benefit shareholders.
As for tipping the wagons out of the way...i seem to recall seeing the upturned chassis of a 4-wheeler, possibly an MGR wagon, on the Manton - Corby line, somewhere near to Wing tunnel many years ago.
I've just had a quick look at a book on the Harrow and Wealdstone crash of 8 October 1952, the second most costly (in human life) accident on British railways. Despite the massive damage to the three trains involved and to the station infrastructure, such was the clearing operation that all of the six lines through the station were back in operation within five days, with some being back in operation within two days of the accident. It is probably relevant that several breakdown cranes were rapidly on the scene, but would there be other reasons why in the past even major incidents seemed to have been cleared up somewhat quicker than less major ones today?
We were only talking about that yesterday, prompted by some photos of the temporary alterations that were quickly made to work traffic normally in both directions over the Up line. It's just north of Seaton Tunnel, I believe, just short of the viaduct.I heard it cost half a million pound for the crane alone. As you mention get in rail cranes - oh no we aren't a proper railway anymore...breakdown cranes don't benefit shareholders.
As for tipping the wagons out of the way...i seem to recall seeing the upturned chassis of a 4-wheeler, possibly an MGR wagon, on the Manton - Corby line, somewhere near to Wing tunnel many years ago.
I knew it was somewhere in that vicinity. I once went out to photograph MML units diverted that way due to engineering, which shows how long ago it was.We were only talking about that yesterday, prompted by some photos of the temporary alterations that were quickly made to work traffic normally in both directions over the Up line. It's just north of Seaton Tunnel, I believe, just short of the viaduct.
Ooh the Mem will be pleased.The line has reopened today, but with significant speed restrictions over the affected section, added to which the signalling in the area has failed. Clearly the job isn't quite finished even after 9 days work.
--- old post above --- --- new post below ---https://www.gov.uk/government/news/derailment-near-langworth-lincoln
The train, reporting number 6E54, was the 10.39 hrs service from Kingsbury Oil Terminal to Humber Oil Refinery. It consisted of a Class 60 locomotive and 22 empty, diesel fuel, tank wagons. The train was travelling at approximately 48 mph (77 km/h) approaching 101B facing points, when the driver reported that he saw a kink in the left-hand rail. Shortly afterwards, the trains brakes automatically applied bringing it to a stand.
Wagons 11, 12 and 13 from the leading end had derailed, each by one bogie, but remained upright. The train had then separated at the trailing end of wagon 13 and there was a gap of about 250 metres to the rest of the train. The following six tank wagons, ie wagons 14 to 19, left the track completely and some rolled over. Wagon 20 was derailed by the leading bogie and wagons 21 and 22 remained on the track. The separation of the train had caused the continuous brake pipe to part applying the brakes to the whole train.
There were no injuries, however, substantial damage was caused to the infrastructure, including the points and signalling equipment. Sixteen of the wagons were later recovered by rail. Wagons 14 to 19 were recovered by crane and transported from the site by road. There were no reports of any leakage of diesel fuel residue from the tanks.
RAIB has obtained CCTV images of the site of the accident at around 12:45 hrs. These appear to show a track buckle forming close to 101B facing points.
Our investigation will examine the sequence of events leading up to and during the derailment, the maintenance of the infrastructure and its preparation for hot weather and any relevant management issues.
Our investigation is independent of any investigation by the railway industry or the Office of Rail and Road (ORR). We will publish our findings, including any recommendations to improve safety, at the conclusion of our investigation; these will be available on our website.
We were only talking about that yesterday, prompted by some photos of the temporary alterations that were quickly made to work traffic normally in both directions over the Up line. It's just north of Seaton Tunnel, I believe, just short of the viaduct.
I heard it cost half a million pound for the crane alone. As you mention get in rail cranes - oh no we aren't a proper railway anymore...breakdown cranes don't benefit shareholders.