Tracked
Established Member
I always thought there was an avoiding line for it, yesterday afternoon was in the NRM looking at the signalling board and a 66-hauled freightliner went through platform 3 (holding up a London train, 1s36 possibly? was around 14:20-ish). Had followed this one on the board & it had come down the ECML.
Went back to York station for about 15:30 and another one came through, which again was of the ECML.
Finally, after deciding to go and have something to eat in York because the train I'd intended to catch was rammed full, at about 17:15 another 66 on a train of empty steel wagons went through (was at the south end of the station this time, so not sure if was off the ECML)
Did see some freight going up the avoiding line, is it usual for it to go through the station? Certainly the first one mentioned caused delay to a passenger train behind when it got held waiting for another London train off platform 6.
Went back to York station for about 15:30 and another one came through, which again was of the ECML.
Finally, after deciding to go and have something to eat in York because the train I'd intended to catch was rammed full, at about 17:15 another 66 on a train of empty steel wagons went through (was at the south end of the station this time, so not sure if was off the ECML)
Did see some freight going up the avoiding line, is it usual for it to go through the station? Certainly the first one mentioned caused delay to a passenger train behind when it got held waiting for another London train off platform 6.
