Apologies in advance if there was a thread, I have almost certainly missed it.
Disclaimer: The following may not have the slightest basis in reality, but I was thinking to myself (dangerous) and wondered what others might think
I've seen several times the absolute headache that the Forth Bridge presents regarding electrification and such (clearances, earthing, leakage, etc.). Some of those things I don't understand because I'm not familiar with OHLE beyond "wires on gantries with big ol' insulators between them".
So, a couple of possibilities I mused upon:
Disclaimer: The following may not have the slightest basis in reality, but I was thinking to myself (dangerous) and wondered what others might think

I've seen several times the absolute headache that the Forth Bridge presents regarding electrification and such (clearances, earthing, leakage, etc.). Some of those things I don't understand because I'm not familiar with OHLE beyond "wires on gantries with big ol' insulators between them".
So, a couple of possibilities I mused upon:
- A non-energised OHLE wire extending the length of the bridge, or at least the impinging support structures, with a neutral section at each end, so that lowering pantographs is not necessary.
- Could a 225, travelling at appropriate speed on the approach, successfully coast the full distance? Similarly, a Class 80x (though even the electric one could limp over if it ran out of speed)?
- Could an EMU, for example a 387, that was stopped at either North Queensferry or Dalmeny, accelerate away from the station to sufficient speed to coast the full distance?
- Alternatively: 750V third rail the length of the bridge. Obviously doable; my thinking here was on a different line: could you "power" a 750V (or, indeed, any lower voltage) section from the 25kV section? Like, literally have a 750V feeder station whose "supply side" is the OLE itself?
- And on a similar note to the above, the same but the 750V section is OLE as well.