Was there ever a plan to build a ralway from the West Highland Line at Tulloch across to the Highland Mainline near Newtonmore?
Yes. In 1894 the West Highland Railway looked into a route from Tulloch across to Kingussie on the Highland Railway, a distance of 32 miles. The proposal was thwarted with ease by the Highland.
The Highland Railway mainly fought a rearguard action against proposals for a railway into Inverness via the Great Glen once it had its’ headquarters set up in the Highland capital, with limited interest itself in the potential of such a route. The Glasgow & North Western Railway surveyed a route up the Great Glen in 1882, but this scheme was ably defeated by the Highland. The scheme was promoted by the North British, and would have run along the opposite side of Loch Lomond to the course the West Highland took, then up through Glen Falloch, Chrianlarich and Tyndrum, but instead of traversing Rannoch Moor the line would have climbed to the Black Mount and then descended into Glen Coe and on to Ballacullish before running along the shores of Loch Linnhe until reaching a through station at Fort William and then onwards to Inverness via the Great Glen. The North British again proposed a, less ambitious, railway to Inverness from Fort William in 1893, when the West Highland line was under construction. The Highland then announced their own identical scheme from the opposite end of the Great Glen. The plans were dusted off once more in the following year in a renewed attack. And then in 1896 the Invergarry and Fort Augustus Railway arrived on the scene:
The Invergarry & Fort Augustus Railway was a completely separate enterprise from the West Highland Railway and was realised largely through the efforts and personal finance of a Lord Burton, who was the chairman of the line. Construction of the line was originally costed at £350,000, but ended up costing £1 million, with one third of the capital spent on the first mile from Spean Bridge and the final mile from Fort Augustus town station to the pier station, which included an expensive swing bridge over the Caledonian Canal.
The railway could have been open for traffic from 1901, but disputes and complications over the running of the line meant that the first passenger train didn’t run until 27th July 1903. The Highland Railway was originally contracted to provide locomotives and rolling stock for the line at a cost of £2000 per half year to the Invergarry and Fort Augustus, as the charges stipulated by the more logical choice of the North British Railway with whom the I&FA made a connection with at Spean Bridge, were prohibitively high. The Highland Railway provided “Skye bogie” No.48 and 4-4-0T No.52 to work the line. The railway never came close to turning a profit. In its’ first six months it produced a total revenue of £907. In the half year ending on 31st July 1904, the railway made £976 in revenue but spent a total of £5,473 in capital.
The timetable provided four trains each way daily. Two of these started at Fort Augustus pier station, and one train from Spean Bridge terminated there. At the end of the 1906 summer timetable the service between Fort Augustus town and the pier station was withdrawn and never resumed: It saw just three years of active use!
The Highland Railway withdrew its’ support from the I&FA on April 30th 1907, and the Fort Augustus line had to very quickly go begging to the North British to provide locomotives and rolling stock to work the railway, with the contract starting on May 4th 1907.. Under North British control the Invergarry & Fort Augustus line used LNER C15 4-4-2 tanks and Drummond R class 4-4-0Ts. The timetable was for four return passenger trains a day in the summer and two in the winter. The majority of trains were timetabled to take exactly an hour to traverse the route, with stops at the three intermediate stations at Gairlochy, Invergarry and Aberchalder.
Lord Burton, who had been chief amongst those filling in the deficit between the Invergarrys’ revenue and expenditure using his own private fortune, died in 1909 and on 31st October 1911 the North British pulled out of operating the Fort Augustus line, but after much negotitation and discussion the Invergarry and Fort Augustus Railway became the property of the North British Railway on August 28th 1914 and train services resumed. The last passenger train ran on 30th November 1933, which was the 12:05 Fort Augustus to Spean Bridge. In the final full year of operation only 1,911 passengers travelled on the line and total revenue was only £179. Freight services continued until 31st December 1946, which in the final years dwindled to a once weekly coal train, although the line saw increased traffic during WW2 with a daily freight train carrying timber and munitions for the military base at Fort Augustus.
All information taken from “The West Highland Railway” by John Thomas; long out of print I shouldn’t wonder!