Timetables now up.
Morning Peak: Six per hour in the peak, four from Bedford, fast from St Alb then west H and St P, two St albans to St Pan shuttles.
Offpeak 4 per hour all from Bedford, two fast from St Albans calling west H and St P only
Evening Peak: Six per hour all trains calling all stations!
http://www.nationalrail.co.uk/posters/TLNorth.pdf
South of Thames timetable here (now correct timetable)
http://www.nationalrail.co.uk/posters/TLSouth(1).pdf
The entire Sevenoaks route doesn't exist. Not mentioned on the timetable at all.
Monday 26 January: Disruption to services due to flooding in a tunnel between Farringdon and St Pancras
Thameslink services will be severely disrupted and services will not run between St Pancras and Farringdon. Please visit www.thameslinkrailway.com for more information.
There will be a half hourly service running between Sevenoaks and Blackfriars via Catford. These trains will stop at all stations.
Southeastern trains to Blackfriars will run as scheduled with the following exceptions:
05:45 Dover Priory to Blackfriars will be diverted to Victoria. After Rochester, it will run direct to Victoria.
07:41 Orpington to Blackfriars will be diverted to Victoria. After Denmark Hill, it will run direct to Victoria.
In the evening all Southeastern services will start at Blackfriars as scheduled.
It's on Southeastern's website:
But that doesn't tell me when the train is turning up - cue lots of people on that entire route unawares of the developing issues, rolling up to the station tomorrow morning (and possibly again on the return) and then find there's only 2tph. Coupled with no easy access to the tube/DLR they are simply going to be packed solid from Bromley.
I thought the whole point of transferring control of the sevenoaks route to Thameslink was so this "it's not our problem" attitude that ran all the way through FCC's life was meant to stop?
OK, so who turned the water back on?
If NR didn't know why water was flooding the track, it ought to have found out. Did NR just hope the water would recede naturally, in which case, there ought to have been contingency planning in case it started to flood again.
If NR did find out what was causing the flooding, what steps did it take to ensure the cause had been removed?
It sounds to me like NR was watching the floodwater go down and hoping for the best. In the meantime, GoVia should have been working out a contingency in case the flood wan't cleared by Monday am.
Hasn't anyone learned how to contingency plan, even after the Christmas Kings Cross farce?
There was a burst water main...
Another potential problems is that it rained Friday night and the river fleet runs underground somewhere near there
OK, so who turned the water back on?
If NR didn't know why water was flooding the track, it ought to have found out. Did NR just hope the water would recede naturally, in which case, there ought to have been contingency planning in case it started to flood again.
If NR did find out what was causing the flooding, what steps did it take to ensure the cause had been removed?
It sounds to me like NR was watching the floodwater go down and hoping for the best. In the meantime, GoVia should have been working out a contingency in case the flood wan't cleared by Monday am.
Hasn't anyone learned how to contingency plan, even after the Christmas Kings Cross farce?
They've got one. It's been published.It sounds to me like NR was watching the floodwater go down and hoping for the best. In the meantime, GoVia should have been working out a contingency in case the flood wan't cleared by Monday am.
Please do tell us how to learn the intricacies of contingency planning, for every foreseeable eventuality, in less than a month?Hasn't anyone learned how to contingency plan, even after the Christmas Kings Cross farce?
But that doesn't tell me when the train is turning up - cue lots of people on that entire route unawares of the developing issues, rolling up to the station tomorrow morning (and possibly again on the return) and then find there's only 2tph. Coupled with no easy access to the tube/DLR they are simply going to be packed solid from Bromley.
I thought the whole point of transferring control of the sevenoaks route to Thameslink was so this "it's not our problem" attitude that ran all the way through FCC's life was meant to stop?
My understanding is that it wasn't the Fleet, but a Thames Water main.
Water mains can be turned off (allegedly it was turned off, but some gonk opened the valve again). It rains regularly in this country, but Farringdon tunnel doesn't flood this badly.
So i tweet both TL and SET asking them both for the timetable.
SET says there's a service between Sevenoaks and Blackfriars and Thameslink has the timings. Thameslink then says SET is planning the timetable.
It's amazing how the sevenoaks route feels like "the forgotten child" :roll:
It appears the off peak London Bridge to Brightons have also been cancelled tomorrow
I don't see why they have to cancel these when the issue is at Fartingdon
The 19 min jourmey time of the off peak Blackfriars to Croydon seems optimistic as well
I'm sure that will lead to another nightmare day on the Brighton Main line
EMT are tweeting that they're sharing some of their platforms with TL trains tomorrow?
Well I'm on a train, no idea if it's fast or slow (I assume slow as it's sat in Platform 1 at St Albans). It's already full and standing - I'm practically stood in the loo! Good luck to those who might want to get on at the next stations!
--- old post above --- --- new post below ---
Other passengers are talking about a broken down train but I can't see anything online - anyone have any info?
Im on the one 10 mins behind u and just left a couple of hundred disgruntled pax at St Albans as too full. Now fast to west Hampstead.
Glad I set off early then! We did squeeze a few more on at Radlett but left people behind at every station after there. At Hendon ot took three attempts to close the doors.
At St Albans the barriers were open and the staff shoiting to passengers to go straight through and buy tickets at the other end. At St Pancras the barriers were closed. Hope nobody gets into trouble.
We arrived into the Northbound platform at St Pancras.
That's frustrating.
It's Thameslink's responsibility now. Regardless of which company's planners are planning the timetable in the background (or, should I say, have planned the timetable), Thameslink run the route and are the public face, so they should be publishing the timetable. The takeover was intended to remove this confusion with only one operator publicly running the show.
Ive bailed out at west Hampstead and taken north and east london lines as did quite a few other pax. Whats the run into st Pancras and tube like?
I was surprised to see people getting on at Kentish Town - as the train was only going one stop surely they would have been better getting the tube/bus?