• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Flood damaged 156478

Status
Not open for further replies.

scotraildriver

Established Member
Joined
15 Jun 2009
Messages
1,848
Rail mag carries a current feature suggesting a heavy rebuild for 156s; I only had a brief scan but very possibly it could have been those on the far north runs. So they may survive an extra decade or two if that goes ahead. In general though I agree, a decent order (preferably for something specially designed to be lightweight and not horrifically expensive to run) would be a good idea and would make sense if it allowed us to shift more than just Pacers. Particularly with current electrification schemes (GWML) already over budget, I think we're going to continue to need a sizeable diesel fleet for some years to come. Many of the 150s are in a very poor state of repair, and it's a concern to consider how much structural integrity can be retained when corrosion appears to be rampant.

156 are not used on the Far North line. They were replaced with 158's years ago.........
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

BestWestern

Established Member
Joined
6 Feb 2011
Messages
6,736
Rail mag carries a current feature suggesting a heavy rebuild for 156s; I only had a brief scan but very possibly it could have been those on the far north runs. So they may survive an extra decade or two if that goes ahead. In general though I agree, a decent order (preferably for something specially designed to be lightweight and not horrifically expensive to run) would be a good idea and would make sense if it allowed us to shift more than just Pacers. Particularly with current electrification schemes (GWML) already over budget, I think we're going to continue to need a sizeable diesel fleet for some years to come. Many of the 150s are in a very poor state of repair, and it's a concern to consider how much structural integrity can be retained when corrosion appears to be rampant.

156 are not used on the Far North line. They were replaced with 158's years ago.........

Okay - my apologies then, the top end of Scotland isn't my strong point; the article spoke of 'scenic trains' so I presume they'd be up there somewhere, rather than on gritty suburban jobs...
--- old post above --- --- new post below ---
Better to just re-form them into 155s again, which is what I think is more likely, unless they are significantly knackered structurally, rather than creating heterogeneous units. Or is there a strong need for 3 car sets which couldn't be met by 4 cars consisting of 155+15x?

There are some structural concerns, the bodies are allegedly sagging across some of the fleet (must be contageous cos some of the drivers seem to have the same problem :D ) which isn't helping their cause. There is certainly a need for more capacity, and three coach trains would be an immediate improvement of course. It also saves considerable cost, as they could just be marshalled into the middle of units 'as is' with no modifications required whatsoever.
 
Last edited by a moderator:

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,762
Location
Scotland
Okay - my apologies then, the top end of Scotland isn't my strong point; the article spoke of 'scenic trains' so I presume they'd be up there somewhere, rather than on gritty suburban jobs.
They are used on the west coast to Stranraer, and I believe out to Fort William so pretty scenic routes. :)
 

455driver

Veteran Member
Joined
10 May 2010
Messages
11,329
However, had a new DMU order been in progress I wouldn't be surprised if an extra unit had been added to it with an existing 156 cascaded to Scotland.

So the leasing company would rather spend £2.5million on a new unit rather than £400K on what is effectively a general overhaul (C6? in modern terms).
 
Status
Not open for further replies.

Top