Ahh, controlled signals generally operate slightly differently. They have a separate overlap track circuit (or axle counter) that starts between the signal post, or beyond the signal post by a couple of meters, and which goes to the overlap point (normally 200 to 300 yards beyond the signal).
As soon as the overlap track circuit (axle counter) detects a train, the signal should go to red. So the opportunity for the signal to change to a less restrictive aspect as a train passes it is very short. Depending on the design of the interlocking, the control that determines if a signal can show proceed or show red can take up to nearly one second to operate (this is by design and is required for another interlocking function).
But, there is an exception to the above. In areas where a train may routinely (*) stop with the front of the train just beyond the signal at a station, or where shunting or propelling moves may take place, again normally in the area of a station (*), “last wheel replacement” may be specified in the design.
* as anticipated to be requirements at the time of the design.
With “last wheel replacement”, the occupation of the overlap track circuit (axle counter) is ignored until either the next track circuit (axle counter) is occupied, or the previous track circuit (axle counter), often called the berth track circuit (axle counter) goes clear.
With semi-automatic signals, it depends on the actual design. Some are more like automatic signals that can be put to red (not to be confused with automatic signals with either a signal post emergency replacement switch or where the signaller has an emergency replacement switch). Others are more like controlled signals, but which normally work automatically. Not to be confused with controlled signals that have an automatic working control.
View attachment 145436
In the above diagram, for an automatic signal section, the berth and and overlap (as shown for example, for block A123) are all a single track circuit (or axle counter) section as far as the interlocking is concerned. There is also a single indication for the signaller.
But for a controlled signal, the berth and overlap track circuits (or axle counter sections) are separate as far as the interlocking is concerned. They are also indicated separately to the signaller.