Quite a boring question, but here goes.
On part of the ECML, signals can display a flashing green aspect, which I'm told is relic from the testing of the InterCity 225, and signified that trains were permitted to run at up to 140 MPH.
If the signaller wanted to check a train down to stop (for example), would the signals work in this order today:
Flashing Green > Steady Green > Double Yellow > Single Yellow > Red.
Or does the "Flashing Green" aspect simply replace the "Steady Green" (i.e. the first signal would display flashing green and the one after would display double yellow) as no trains are permitted to run any faster than 125 MPH?
Apologies if the above isn't clear!
On part of the ECML, signals can display a flashing green aspect, which I'm told is relic from the testing of the InterCity 225, and signified that trains were permitted to run at up to 140 MPH.
If the signaller wanted to check a train down to stop (for example), would the signals work in this order today:
Flashing Green > Steady Green > Double Yellow > Single Yellow > Red.
Or does the "Flashing Green" aspect simply replace the "Steady Green" (i.e. the first signal would display flashing green and the one after would display double yellow) as no trains are permitted to run any faster than 125 MPH?
Apologies if the above isn't clear!