LBSL intends to enter into the following contracts:

Route
Current Operator
New Operator
Current PVR
Award PVR
QSI Standard
Contract Ref.
Vehicle type
Contract Start Date

TRANCHE 422
60
Arriva London South
Arriva London South
15
15
1.10 mins EWT
QC 42201
New & existing double deck
31st August 2013


166
Arriva London South
Arriva London South
8
8
78% on time
QC 42202
Existing single deck
31st August 2013


293
Metrobus
Metrobus
7
7
86% on time
QC 42203
Existing single & double deck
31st August 2013

404
Quality Line
Quality Line
1
1
90% on time
QC 42204
New single deck
28th September 2013


412
Arriva London South
Arriva London South
8
8
82% on time
QC 42205
Existing double deck
31st August 2013

434
Abellio
Metrobus
3
3
82% on time
QC 42206
New single deck
31st August 2013


466
Arriva London South
Arriva London South
17
17
0.90 mins EWT
QC 42207
Existing double deck
31st August 2013


612
Metrobus
Arriva London South
2
2
100% on time
QX 42208
Existing double deck
31st August 2013


685
Arriva London South
Arriva London South
1
0*
100% on time
QX 42209
Existing double deck
31st August 2013


TRANCHE 425
165
First London East
Stagecoach East London
11
12
0.90 mins EWT
QC 42501
New single deck
28th September 2013


179
First London East
Stagecoach East London
11
11
1.10 mins EWT
QC 42502
Existing double deck
19th October 2013


252
First London East
Stagecoach East London
12
12
0.90 mins EWT
QC 42503
New & existing double deck
28th September 2013


256
Arriva Kent Thameside
Stagecoach East London
10
10**
0.80 mins EWT
QC 42504
New single deck
28th September 2013


365
(24 hour)
First London East
Stagecoach East London
11
11
0.90 mins EWT
QC 42505
New double deck
28th September 2013

* Fleet PVR - uses a bus crosslinked from route 405D.
** Fleet PVR - double deck bus used in AM peak is crosslinked from route 252.

All contracts are awarded as specified, including introduction of a Sunday service on route 434, and will use conventional diesel engined vehicles.

The existing double decks to be used on routes 60 and 466 will be the current allocation of 2008 built vehicles. Route 166 will use the current allocation of 2008 built 57 capacity single decks. Routes 412 and 612 will initially use 2003 built double decks, to be replaced during 2015 by vehicles dating from 2008 or later cascaded from other routes.

Route 293 will continue to use the current allocation of seven 2008 built single decks and one 2009 built double deck.

The existing double decks to be used on routes 179 and 252 will be 2008 built vehicles currently allocated to route 106.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,260
Location
North West
First did want to sell Dagenham to Stagecoach but could not agree a price. Maybe they are willing to close DM by stealth. I think First are keen to keep Lea Interchange as it serves Olympic Park and runs central London routes. Indeed, LI has just wo route 425 from Go-Ahead London.

You say Arriva route 60 will use buses from 2008. Will these be E400s from route 102, displaced by DWs off route 29?
 