I believe that the only service to regularly avoid TM was the Portsmouth(+Brighton)-Cardiff, and that was largely as it had had a loco change at Salisbury and reversal would involve another one. Horribly slow train, one of the few that made a mandatory stop at Dilton Marsh.

If I recall correctly it used Platform 1 at Newport (High Street) and the relief line between Newport and Cardiff.

There is a daily Bristol Parkway to Bath Spa service (2R98 1553 from Parkway, usually formed of a 3-car 158) which avoids Temple Meads... I am led to believe that this is principally to serve staff at MOD Abbey Wood... the building of this site being the reason for the relocation of the station from Filton Junction to Filton Abbey Wood... Many of the staff transferred from an MOD site in Bath, and many still live in Bath... Though there does not appear to be a corresponding direct morning service from Bath..
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Henbury Loop

Member
Joined
20 Sep 2015
Messages
187
Location
South Gloucestershire
I had a few spare minutes today, so I thought I would go take a look at the railway, and see if there is any sign of work on the four tracking. And there was! It wasn't easy to photograph at Bonnington Walk because of the enhanced bridge for the electrification that isn't coming:

DSC_2418_zpskns2medp.jpg


Looking towards Filton Abbey Wood:

DSC_2415_zpsq6dotcx4.jpg


Looking towards Temple Meads, it seems that the northbound platform of what was Horfield station has gone, although the southbound remains:

DSC_2417_zps2adxnzvy.jpg


There is now a cycle and pedestrian pathway:

DSC_2419_zpszeaywhbt.jpg


Looking north from Constable Road, the clearance work is obvious:

DSC_2422_zpsbh6pplf8.jpg


A crafty change of lens to the 75-300 mm gives us more of an insight into what is happening:

DSC_2424_zpsdf5iu3aq.jpg


Looking the opposite way, towards Ashley Down, the access road can be seen:

DSC_2420_zpsfrrsnajw.jpg


More orange army in the distance:

DSC_2421_zpszwgyf68p.jpg


DSC_2428_zpsmuseftri.jpg


Finally for today, I am on the site of the former Ashley Down station, where work progresses. Looking north:

DSC_2430_zpstqsoyrv6.jpg


and south, towards Narroways:

DSC_2434_zpsqzwsxjfy.jpg
 

D6975

Established Member
Joined
26 Nov 2009
Messages
3,046
Location
Bristol
I believe that the only service to regularly avoid TM was the Portsmouth(+Brighton)-Cardiff, and that was largely as it had had a loco change at Salisbury and reversal would involve another one. Horribly slow train, one of the few that made a mandatory stop at Dilton Marsh.

If I recall correctly it used Platform 1 at Newport (High Street) and the relief line between Newport and Cardiff.

No, there was a period when nearly all CF- Pompeys called at Stapleton Rd and went round the curve. Connections at Stapleton Rd were mainly Severn Beach services plus a shuttle used to run up and back when there wasn't a suitably timed local.
 

Ash Bridge

Established Member
Joined
17 Mar 2014
Messages
4,213
Location
Stockport
As above, I shall be watching out of the window with interest as we pass through on route to Cornwall this July.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Echoed. If you felt like going back every fortnight or so, you would be as popular on here as the good people documenting stuff in the Manchester area. I go to Bristol sometimes for family reasons so will ensure I always have my camera with me. The foreshortening on some photos may lead people to think that e.g. Ashley Hill station was on a curve, but I don't think it was, at least, not much of one.
 

Sean Emmett

Member
Joined
9 Mar 2015
Messages
522
Looking the opposite way, towards Ashley Down, the access road can be seen:

DSC_2420_zpsfrrsnajw.jpg


I understood the former (confusingly named) Ashley Hill footbridge at 3m 11c was due to have been replaced by Jan 2017. No sign of it yet. Can anyone advise present situation?
 

Henbury Loop

Member
Joined
20 Sep 2015
Messages
187
Location
South Gloucestershire
Stapleton Road Viaduct is being demolished this weekend as part of the 4 tracking project.

Some great photos on Network Rail's feed.
 

Attachments

  • FB_IMG_1501349348424.jpg
    FB_IMG_1501349348424.jpg
    98.4 KB · Views: 154
  • IMG_20170729_183226.jpg
    IMG_20170729_183226.jpg
    159.6 KB · Views: 139

Hellzapoppin

Member
Joined
16 Jan 2016
Messages
266
Plenty of press attention today including filming for a C4 documentary I believe. Not sure when that's being aired but as soon as I find out I'll post the info. Sad to see the viaduct go as its a lovely structure but sadly too far gone to save.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
Plenty of press attention today including filming for a C4 documentary I believe. Not sure when that's being aired but as soon as I find out I'll post the info. Sad to see the viaduct go as its a lovely structure but sadly too far gone to save.

Many thanks.
About 1891 according to my track map (Dr Days to Stapleton Road quadrupling) that ended just before Narroways Hill Junction*. The rest up to Filton followed in the 1930s modernisation scheme, to relieve unemployment.

*Edit. Had another look and technically, the 1891 quadrupling from Dr Days ended just after the viaduct we are discussing, which is being dismantled. It joined an earlier extension southwards of the line through Narroways Hill, which itself had been doubled from a single line in 1886, when the junction w now see, was eliminated and the junction made instead at north of where the beginning of the viaduct was eventually constructed. It's a complex story and you need the excellent R.A Cooke publication to follow it.
 
Last edited:

Hellzapoppin

Member
Joined
16 Jan 2016
Messages
266
I was hoping that the viaduct had a plate with the date and manufacturer on it but alas no, would have made a nice addition in the office. Forgot to mention that Ashley Hill footbridge is receiving some attention tonight, I believe the cill beams are going in tonight.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Press release

https://www.networkrail.co.uk/feeds...way-following-stapleton-road-viaduct-removal/

Following the successful removal of the Stapleton Road viaduct in Bristol, the site is now being prepared for the installation of a new bridge next year. This will enable more train services and a more reliable railway for passengers as part of Network Rail’s Railway Upgrade Plan.

The replacement of the Victorian viaduct is a crucial part of Network Rail’s Filton Bank Four Tracking project, which is an expansion of the track between Dr Days Junction and Filton Abbey Wood station.

The removal of the viaduct was completed successfully ahead of schedule and was documented with time-lapse and drone footage:

The new bridge is a key component to allow for the doubling of railway lines through the area, enabling an increase in train services to meet expected growth in passenger numbers. It is also required to allow the delivery of a new post-2018 timetable and will enable an increase in freight services.

This upgrade work will also help reduce disruption to rail services caused by maintenance, with four lines operational rather than two.

Network Rail will now carry out works to get ready for the installation of the new viaduct next summer, including sheet piling work at Fox Park, from mid-October into December.

Sheet piling consists of inserting metal sheets into the ground vertically as a protective measure for buried services e.g. cables.

Working hours will mostly be Monday to Friday during daytime hours only. Local residents and businesses will be informed in advance of any works outside of these hours, and of any future road closures that may be required to allow this work to take place.

A public drop-in event for residents to bring their questions or concerns about this work to the project team will be held next month at a date and location to be confirmed.

Chloe Allen, project manager for Network Rail, said: “The replacement of the viaduct is vital as part of our Railway Upgrade Plan to provide a better rail service for passengers travelling through Bristol.

“Now that the viaduct has been successfully removed, we are turning our attention to preparing the site for the installation of the new bridge next year, which will enable us to deliver the benefits of the Filton Four-Tracking scheme to passengers.

“I encourage local residents to come along to our drop-in event, which we will confirm and advertise in the coming weeks. Anyone that is unable to make this event can contact Network Rail’s national helpline on 03457 11 41 41 or contact crwest@networkrail.co.uk to find out more about this work.”
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,239
Last edited:

Tom Quinne

On Moderation
Joined
8 Jul 2017
Messages
2,225
There is a T3 tomorrow night to enable ballast to be dropped on the new formation ready for slewing across at the required locations.
 

Chris M

Member
Joined
4 Feb 2012
Messages
1,060
Location
London E14

Hellzapoppin

Member
Joined
16 Jan 2016
Messages
266
The council had some input into the design of the new structure because of the local issues. The piers had to be designed in such a way that they didn't present a hiding place for muggers, drug pushers, addicts etc.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
The council had some input into the design of the new structure because of the local issues. The piers had to be designed in such a way that they didn't present a hiding place for muggers, drug pushers, addicts etc.

That sadly sums up what folk think of the area. I have been told it is not as bad as that but I understand some remedial work for the park is planned. I think it is called Fox Park?
 

Hellzapoppin

Member
Joined
16 Jan 2016
Messages
266
We're not allowed to work in that area on our own and when Easton Road bridge was done several guys were threatened with shooting, they had to lock themselves in the welfare cabin. It's not a good area and we have had to have police protection on a couple of occasions. We also have regular issues getting the large amounts of used syringes removed which get dumped trackside.I feel sorry for the good people in the area. From what I've seen Fox Park is the name.
 