Good pictures, it seems to be coming along well. Thanks again
Amazing videos you’ve posted around Kirkcaldy and Thornton, they’ve really cracked on in the past month!So i've finally been out and had a look at progress when it's not dark or tipping down with rain....
Also noted piles in the ground between Thornton Junction and the access point about a mile south.
== Doublepost prevention - post automatically merged: ==
I had forgotten that I had taken a photo of Thornton feeder station....
Interesting, as the initial maps and EIA plans showed the electrification stopping east before it got to the station, now seems be going further west towards Lochgelly.Cardenden Station to recieve new footbridge, as well as new electrification visuals available on Fife Council planning permissions website.
That looks pretty substantial.Lady Nina Square new footbridge looks to be nearly complete and receiving final touches in Coaltown of Balgonie - images from a local friend:
The Scottish teams have shown the benefit of continuous work honing there skills and delivering efficiency although when any of it will see a pantograph remains to be seen but at least the juice will be there when they arrive.So i've finally been out and had a look at progress when it's not dark or tipping down with rain....
Also noted piles in the ground between Thornton Junction and the access point about a mile south.
== Doublepost prevention - post automatically merged: ==
I had forgotten that I had taken a photo of Thornton feeder station....
Yes, HST differential limits apply to Classes 158 and 170.do the 158/170s currently use those or is it just the HSTs, and would the new BEMU trains be expected to use them?
Yes, HST differential limits apply to Classes 158 and 170.
It remains to be seen what the BEMUs are allowed, but I'd be shocked if they weren't also permitted to use HST limits.
looking at google maps there looks to be some servicesNew visuals of the Glenrothes with Thornton road bridge, which will take (in my opinion) a ridiculous 14-month closure. I know there are reasons for it such as services and mains.
it will be fine unless the council dig up Blackwood RdCould be worse, it could be the main road in and out of Thornton thats closing for 14 months
.........oh hang on a minute !!
Adding onto this, a quote from the article says this:Looks like the work at Glenrothes with Thornton station is to be put on hold after local complaints:
Great to see progress in the Dysart area now. It seems a LOT of vegetation work will be required to allow OLE clearance, and it's a good job they're doing it right this time.The first mast base just north of the old Dysart station was sunk in the early hours of Thursday morning, waking me up as it was driven in and seen on the left of this photo taken yesterday.
All good news but this bit caught my eye. Really good news.Twin Siemens buildings installed at Thornton Jcn with cable routes substantially complete.
Indeed, I'll see if I can find an image of it in my camera roll. It also seems there is a road work near the site, scheduled between 18/05 and 17/08, for some sort of "Excavate, backfill and reinstate for a new connection" work.All good news but this bit caught my eye. Really good news.
Works to demolish existing rail bridge and replace with new structure. Works will be phased as follows: Utility diversions under 2-way temporary traffic lights from 8th June - 18th Oct., followed by demolition of existing and construction of new structure under full road closure from 19th Oct.2026 until 31st March 2027, and then reverting back to temporary traffic lights to reinstate utilities within new structure form 1st April 2027 until 9th July 2027
Honestly there is not much more they can do short of closing the stationAn update to the infamous Thornton Station overbridge plan.
It appears that there will still be no alternative diversionary routes proposed, and the only difference will be a slightly smaller bridge closure time.
Quoted from roadworksscotland.org.