With the announced closure of the PS by Mar 2020, I guess it will be difficult to justify the retention of this line given the only other regular traffic is the JLR/Aluminium train to Italy. I understand coal stocks are high, but presumably there will be the need for some clearance work when the PS is finally closed.

Warrington Borough are keen to redevelop the Bridge Foot area so it's a perfect storm ☹

Cheers

Mark
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,119
I believe that Northern Powerhouse Rail are looking at the Fiddlers Ferry line as a possible alignment between Warrington and Liverpool.
 

GreatAuk

Member
Joined
16 Jan 2018
Messages
60
Yes, I'm not aware of any official announcements about using the line for NPR/HS3, but it would seem like quite a good option, and would fit in with the recently announced passive provision for a junction off the main HS2 route.

If they did end up using the line I imagine quite a lot of it would need straightening out / otherwise rebuilding though...
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
If they did end up using the line I imagine quite a lot of it would need straightening out / otherwise rebuilding though...

Yes it doglegs (sharply) through both Warrington and Widnes, so not much use for a fast route.
Industry and development hems the line in through Warrington too.
I think coal stocks at Fiddlers Ferry were being transported away after the initial rundown.
The skyline will look a lot different when the cooling towers go.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,281
Well if you are going to stop all trains in Warrington it wouldn't be such a massive problem.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,551
Location
Torbay
Well if you are going to stop all trains in Warrington it wouldn't be such a massive problem.
Here's a sketch I made some time ago. I think it appeared in a previous HS2 to Liverpool thread. Orange is former and existing alignment reused (rebuilt as necessary). Yellow is new alignment. Route would cross under the WCML at south end of Bank Quay station with new low level platforms.
warrington.jpg
 

wireforever

Member
Joined
7 Feb 2019
Messages
126
After Latchford high level bridge was uneconomical to repair the line was cut at Latchford by the old rugby ground and was used daily by coal trains to and from Fiddlers Ferry PS for loco run round at Latchford sidings.It could be used for a tram route/light rail to link Widnes Warrington BQ Warrington Central and Newton le Willows and link up to services on the reopened Halton Curve.Last time I walked down the footpaths Sankey Bridges old station still had a platform visible thru the weeds and Fiddlers Ferry station still has its platforms.Probably won't happen unless a good business case is put forward ?
 

Mark Enderby

Member
Joined
7 Sep 2018
Messages
19
As for the line over the ship canal, there's a rumour that a company is planning to "reclaim" the embankment on the South side of the bridge. Not sure what's so valuable but I'm sure the locals will have something to say if it's true !

Cheers

Mark
 

Ducatist4

On Moderation
Joined
29 Apr 2019
Messages
988
Location
Mansfield
They’ve also just advertised for Clipstone West box, if that lines gets three trains a week that’s called a busy week (no joke)!
 