• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Fencing on platforms

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

westv

Established Member
Joined
29 Mar 2013
Messages
4,410
Grantham has a similar platform and that has no fence.
 

tpjm

Member
Joined
25 Jan 2019
Messages
487
Location
The North
Considering Platform 2 at Stalybridge sees about one train a week, it’s quite obvious that this fence is for the benefit of Platform 1. It’s quite narrow at that end and can get pretty busy in the morning.

Scarborough Platform 1 and 2 have platform on both sides which are not fenced off so I would think Stalybridge is entirely driven by the narrow nature of the platform.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
But 7 could be used instead of 6 if need be. Numerous LUL stations are similar, as well as various non-3rd-rail NR stations (Ulverston is the only through station that comes to mind).
I don't think fencing is routine (unless on 125mph routes?)
Indeed it can be used instead. I have done so twice I seem to recall.

Of course it wasn't intended for it to be used. All were platform changes from 5 to 6 and the guard opening the doors as if it was platform 5. I don't blame them for doing that though. This was probably over 4 years ago now.
 
Status
Not open for further replies.

Top