73110
Member
Half Yearly results for First http://www.firstgroup.com/assets/pdfs/investors/annual_reports/DRAFT_INTERIMS_09_Current.pdf
Less trains will no doubt be a good way of moving things towards having the franchise taken away - or at best, not being given the short extension at the end of the TL project.
Wow; I did think it was going to be tough when Elaine left, but I never realised how quickly things would fall to pieces. Surely they made big profits because they managed to run things very well, and while the TL side needed a lot of work, they seemed to be getting things done pretty well.
Now look at it; we're at a turning point where things are rapidly approaching rock bottom and they're planning FURTHER cuts to services in the future.
Split the network in two with Brighton trains running into London Bridge and turn Blackfriars into a terminus for Bedford trains. Just because it might be possible to run a through train from Kings Lynn to Littlehampton doesn't make it desirable.
I'm not sure about cutting things in two, but there's probably an argument for not sending all trains through the middle, and having some trains start at St Pancras south and Blackfriars north (or wherever) - which would make it easier to board a non-packed train in the middle.
Few people will be worried about where the train started from, especially when a packed train arrives at St Pancras and loads of people who've arrived on Eurostar want to get on with their baggage.
I wonder how many people out in Bedford, Luton or St Albans want to go to Brighton (or beyond London)? Obviously some, especially off-peak and weekends (but there's more capacity then), but I am sure you could cut a fair few trains.
Surely if your first highlighted point is true, then the answer to your second point is lots.
(Guess who was bored this morning)I'm not sure about cutting things in two, but there's probably an argument for not sending all trains through the middle, and having some trains start at St Pancras south and Blackfriars north (or wherever) - which would make it easier to board a non-packed train in the middle.
Few people will be worried about where the train started from, especially when a packed train arrives at St Pancras and loads of people who've arrived on Eurostar want to get on with their baggage.
I wonder how many people out in Bedford, Luton or St Albans want to go to Brighton (or beyond London)? Obviously some, especially off-peak and weekends (but there's more capacity then), but I am sure you could cut a fair few trains.
My idea can't be done - but it should have been thought about. I didn't think terminating trains at Farringdon or City would be a good idea. I think there's an argument for a cross-over - but only a small number of trains doing this while the others go all the way.
So, Brighton > St Pancras
Bedford > Blackfriars (or London Bridge?)
etc
You obviously know more as you're on the front line - and the whole splitting idea only really works if there's somewhere to park trains and reverse them. It's all totally and utterly impossible with the set up and what we get at the end of the TL project (however it comes out), so all of this a 'what if' fantasy discussion anyway.
The other option would be to end a percentage of trains at St Pancras to split services in half - but that is also impossible with the current setup and no chance of it changing without a LOT of work!
I do wonder why we're even discussing this - but also why this wasn't thought about before someone thought you could reliably run 24tph through the core potentially using Bombardier trains!!
Glad to have stimulated some discussion on the topic of Thames-un-Link.
I accept that with the current pattern of services and infrastructure it wouldn't work, but we need to think outside the (Stpancras)box here.
If the stopping services to Luton & St Albans were scrapped, that would leave a four-track railway all the way from Kentish Town to Bedford for a semi-fast and fast service. There is no need to run a train service for the inner-suburban stations as alternatives exist for people living near them.
This evening we had the ridiculous situation of trains running ALL STATIONS from Blackfriars to Bedford. Why were long-distance passengers (who pay through the nose for their season tickets) being inconvenienced because trains had to stop additionally at Kentish Town, Cricklewood, West Hampstead et al? Has nobody heard of the Jubilee Line or the Northern Line?
I'm sure that a four-platform station is possible at Blackfriars with two through roads and two bay platforms. The time taken to turn a DOO train there shouldn't cause too many problems if the bay platforms are built either side of the through tracks. Automatic Train Operation has been suggested for the Core services so that should allow headways to be reduced. Of course there was a terminus available at Moorgate (Midland) but FCC saw fit to close it because rebuilding Farringdon to take 12 car trains was a priority.
Time to start planning and junk the mess that is FCC and Thameslink.
Nobody wants to travel from Luton Airport to Gatwick Airport and commuters will adapt to reduced through services.
Nobody wants to travel from Luton Airport to Gatwick Airport
2) However, the need to get people from St Albans or Kentish Town to Gatwick Airport, and the need to get people from Croydon and Three Bridges to Luton Airport, is significant.
1) the airport-to-airport issue is negligible - Luton is entirely frequented by point-to-point budget airlines and holiday charters, while Gatwick is mostly budget and charter with a bit of scheduled long-haul (unlucky US carriers, plus BA's Caribbean flights). There's very little reason why you'd ever want to transfer from one to the other.
.
As a previous poster has said, passengers now use Thameslink core services as an alternative to getting on the tube. Surely that puts them at odds with long-distance passengers.
What I was suggesting is that at present Thameslink is trying to be both a long-distance commuter service and an alternative to the tube and a way of passengers getting to two of the south-east's main airports. Those three things are incompatible.
At present, the available trains and drivers are insufficient to do all three.
By the way, can anyone give me a good reason why trains are still being short-formed. If they're only running half the trains, there must be sufficient spare capacity to create permanently coupled pairs at Selhurst & Cauldwell.
17.42 from Blackfriars tonight was 4-car and it was a zoo at St Pancras!
Oh, and by the way, it may be an efficient use of rolling stock to run trains all the way from Brighton to Bedford, but the possibilities for delay are endless. It is difficult to explain to a bemused passenger at St Pancras wanting to head north that their train is being delayed because of something that might have happened in East Sussex. The service was much better for northbound passengers when it was split.