cjmillsnun
Established Member
- Joined
- 13 Feb 2011
- Messages
- 3,275
And the 91sEarly 90s, it was in relation to the networkers
And the 91sEarly 90s, it was in relation to the networkers
319s were among the first victims of the wrong kind of snow I thought. As the phrase was coined in February 1991 and Networkers didn't enter service until late 1992.Early 90s, it was in relation to the networkers
Let us not overstate the impacts here. The coupling issues were indeed a nuisance, but readily solved in interim by running 6-car units round all day until overcome. The 303 transformers (and similar on the GE lines) were not across the board, but only on one of a number of manufacturers' electrical gear. When the Glasgow trains were all withdrawn over a weekend a complete steam service was provided from the following Monday, to the old timetable and diagrams, all the resources having been pulled together in 48 hours - there was a magazine article at the time which described the detail of this, something which I think we could challenge modern management to repeat.508s and 313s also had a lot of bother with their electrical coupling blocks.
303s had the exploding transformers.
... so not a fault-free introduction then.When the Glasgow trains were all withdrawn over a weekend a complete steam service was provided from the following Monday, to the old timetable and diagrams, all the resources having been pulled together in 48 hours - there was a magazine article at the time which described the detail of this, something which I think we could challenge modern management to repeat.
More recently, it seems to have caught Vivarail out too![Siemens] actually measured the 750V DC supply voltage at various places on the Southern Region for real world data and were shocked at how much the voltage varied!
Unless that is modifying something because it didn’t work (which is what a prototype is for) or a response to new legislation, the answer is that you leave it as it was and introduce the slightly better bells-and-whistles in the next order.The trouble is that you'll build a prototype then almost always realise there's a load of things that you want to do differently on the production model, then you could have trouble with the production model that you didn't with the prototype, DP2 vs Class 50 for example. The alternative is to either build a number of slightly different prototypes, or after the first one build a second prototype with the new features you want. The first is potentially outrageously expensive and a maintenance nightmare, especially if the production ones get cancelled, the second is less expensive (but still inevitably more than a single prototype) but heavily delays the build and introduction of the production model.
No they weren't but BR and the suppliers were all over it and had a solution a matter of weeks after the spate of transformer failures. AEI came up with a new transformer design which had to be fully type tested and one unit subject to 20k miles fault free running before full retrofitting was commenced. Then 5 units/week were being refitted and subject to 2k miles fault free running before being placed back into traffic within four months of withdrawal.... so not a fault-free introduction then.
so perhaps the moral is get them into use to really shake them down but hold onto previous units just in case.