The latest info on next Class 66 deliveries I can find is.
No sign of the Fastline order and yet, found this,
http://fastline-group.com/news
So what are they going to use on the E.On contract. I doubt 3 x Class 56 is going to be sufficient traction? It appears they are going to be short of some haulage capacity come April, I fear. Unless someone else has a lot of spare capacity. How long should it take to get the type onto their safety case and complete the training?
I cant see how Fastline can complete their contractual obligations without more locos. Even if they drop the container runs 3 class 56s are not going to be enough. I doubt they could get sufficient 56s restored in time even if they could source them. Advenza 57s how busy are they? DRS Class 57s, DRS Class 66s or Cotswold Class 47s in pairs or DRS Class 47s in pairs. Or even EWS Class 67s. What do Hanson have in mind for their growing fleet of refurbished Class 56s. I think I read that Fastline wanted 5 Class 66s for the job four in traffic and one cover/training/repair/service, that would fit as they have ordered 4 rakes of wagons and three spares, so they are looking at an intensive operation. Five type 5s is minimum required I think, or equivalent.
Your comments and observations much appreciated.
Be lucky
David
Sources now saying that numbers beyond 599 will be 955 - 959. That suggests that F/L will be not ordering any more GMs having committed themselves to GE from next year. There is a real problem in finding numbers in the 66xxx range that are not already taken up by SWT EMUs - what a nonsense!"GB's five, 728 - 732 will be on the next ship - as should be as being the first of the outstanding orders. They should be accompanied by 595 - 597. Departure from Halifax should be around 6/7th March.
No sign of the Fastline order and yet, found this,
http://fastline-group.com/news
£40 million E.ON contract for Fastline Ltd
Fastline Limited has secured a five-year contract to haul coal for E.ON UK plc, the UK’s largest integrated power and Gas Company. The contract will commence in April 2008 and has an expected value of £40 million over the five-year period with the potential for extensions of up to a further five years.
So what are they going to use on the E.On contract. I doubt 3 x Class 56 is going to be sufficient traction? It appears they are going to be short of some haulage capacity come April, I fear. Unless someone else has a lot of spare capacity. How long should it take to get the type onto their safety case and complete the training?
I cant see how Fastline can complete their contractual obligations without more locos. Even if they drop the container runs 3 class 56s are not going to be enough. I doubt they could get sufficient 56s restored in time even if they could source them. Advenza 57s how busy are they? DRS Class 57s, DRS Class 66s or Cotswold Class 47s in pairs or DRS Class 47s in pairs. Or even EWS Class 67s. What do Hanson have in mind for their growing fleet of refurbished Class 56s. I think I read that Fastline wanted 5 Class 66s for the job four in traffic and one cover/training/repair/service, that would fit as they have ordered 4 rakes of wagons and three spares, so they are looking at an intensive operation. Five type 5s is minimum required I think, or equivalent.
Your comments and observations much appreciated.
Be lucky
David