A nice surprise to see a Cubic engineer at Forest Hill installing the FasTIS terminals this afternoon.
I have no idea if the other ex Southern stations are having them installed this week, however it should solve a lot of Oyster related issues at those south London ELL stations which have continued to use SHERE since LOROL took over management of those stations in September 2009.
I have no idea if the other ex Southern stations are having them installed this week, however it should solve a lot of Oyster related issues at those south London ELL stations which have continued to use SHERE since LOROL took over management of those stations in September 2009.