• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Far North Line in the snow

Status
Not open for further replies.

swaldman

Member
Joined
19 Jan 2013
Messages
461
Hi folks,

As you know the north of Scotland has had heavy snow over the last few days. The A9 was closed for days, and no trains ran from Wick or Thurso, meaning the north was cut off.

Various people have gotten nice photos of 37s travelling to Wick and back during this time, on "proving runs". Light engine, sometimes with plough blades, but no independent plough. But no passenger trains have run.

So... Firstly, given that the 37s are getting through, how come no passenger trains? I'm guessing maybe a combination of "a 158 can't cope with what a 37 can" and "we'll accept a higher risk of a couple of staff being stuck than a whole train of passengers"?
And secondly, since there are no passenger trains running, what's the point of sending the 37s up and down the line?

Thanks.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

styles

Established Member
Joined
7 Dec 2014
Messages
4,878
Location
Gwynedd
They are planning to restore services.

If they're not running to Inverness on the 16th January it will cause some of the locals some disruption.
 

Morayshire

Member
Joined
6 Feb 2019
Messages
302
Quick glance at Scotrails journey check says they are planning to resume passenger services today to/from Wick/Thurso. But the Kyle of Lochalsh line remains shut.
 

CW2

Established Member
Joined
7 May 2020
Messages
2,222
Location
Crewe
Reported elsewhere that a 37 with miniature ploughs tried to clear the Inverness - Kyle route yesterday, but turned back at Achnasheen due to excessive snow, i.e. more than the miniature ploughs could clear.

Until the route is sufficiently clear of snow, you can't attempt to run a passenger service.
 

mpthomson

Established Member
Joined
18 Feb 2016
Messages
1,383
There was a photo on Instagram this morning of the Kyle line past Achnasheen. There's been so much snow that it's difficult to make out the route of the track even, so a lot more work needed to get it operational for passengers or any other train. Apologies for the image quality, but you get the idea.Snow.jpg
 
Last edited:

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,920
Location
Fenny Stratford
"we'll accept a higher risk of a couple of staff being stuck than a whole train of passengers"?
that seems sensible
what's the point of sending the 37s up and down the line?
To keep the line clear of snow/check the line is unobstructed so that services can restart - not much fun if you send the first 158 out and it runs into a snowbank no one knew about!
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,408
Location
Somerset
that seems sensible
Indeed - while it can’t be much fun for the crew concerned if they do get stuck, they are very unlikely to be aged over 80, be 8 and a half months pregnant or have a medical condition which could make getting stuck for a few hours in a snowdrift fatal. They’re also getting paid for it… (I don’t mean that that justifies reckless treatment of crew - but it does make a bit of a difference if your train is stuck in a drift at Achanalt or somewhere.
 

EveningStar

Member
Joined
11 Jan 2016
Messages
272
Location
Deepest, darkest Northumberland
Saw various photos yesterday of class 37 plus ploughs and immediate thought was that whoever authorised the purchase of class 37 over 60 years ago gifted the railway a 'Really Useful Engine' ... such a versatile design.
 

12C

Member
Joined
21 Jul 2021
Messages
306
Location
Penrith
And secondly, since there are no passenger trains running, what's the point of sending the 37s up and down the line?
Surely better to try to clear the daily snowfall with a 37 in readiness for opening, rather than letting it build up for days to the point it’s impossible to clear.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,827
Reported elsewhere that a 37 with miniature ploughs tried to clear the Inverness - Kyle route yesterday, but turned back at Achnasheen due to excessive snow, i.e. more than the miniature ploughs could clear.

Until the route is sufficiently clear of snow, you can't attempt to run a passenger service.
It was also reported that the issue was a fallen tree beyond Achnasheen.
 

swaldman

Member
Joined
19 Jan 2013
Messages
461
Shots of the Kyle line are beside the point, although pretty - the locos *have* been arriving in Wick. I take the point about keeping it clear(ish) rather than letting it get worse. Thanks.
 

Class83

Member
Joined
8 Jun 2012
Messages
610
37s with drift ploughs seemed to start at Inverness, work to Aberdeen then down to Dundee. Presumably they need to go back up HML then do Kyle line now. Change in wind direction should help in NE, but may mean higher central and western routes are more of a challenge.

Was surprised that south of Aberdeen got closed, would have though with a few extra overnight 37s patrolling it should be busy enough to stop huge drifts developing. Far North and Kyle lines have far fewer services so longer between them for drifts to form.
 

Essan

Member
Joined
22 Feb 2017
Messages
616
Location
Evesham / Lochailort
Saw various photos yesterday of class 37 plus ploughs and immediate thought was that whoever authorised the purchase of class 37 over 60 years ago gifted the railway a 'Really Useful Engine' ... such a versatile design.

My thought was "what would we do if we didn't still have them running?"

What other - more recent - locos are there that could do their job, just as well or better, in these conditions?
 

Shimbleshanks

Established Member
Joined
2 Jan 2012
Messages
1,283
Location
Purley
I thought one of the major reasons given in the 1960s for keeping these lines open was that they would be able to operate when roads were blocked by snow?
 

Highlander1

Member
Joined
5 Sep 2025
Messages
179
Location
Inverness
Hi folks,

As you know the north of Scotland has had heavy snow over the last few days. The A9 was closed for days, and no trains ran from Wick or Thurso, meaning the north was cut off.

Various people have gotten nice photos of 37s travelling to Wick and back during this time, on "proving runs". Light engine, sometimes with plough blades, but no independent plough. But no passenger trains have run.

So... Firstly, given that the 37s are getting through, how come no passenger trains? I'm guessing maybe a combination of "a 158 can't cope with what a 37 can" and "we'll accept a higher risk of a couple of staff being stuck than a whole train of passengers"?
And secondly, since there are no passenger trains running, what's the point of sending the 37s up and down the line?

Thanks.
The point is to clear the line of snow. Various reports via Network Rail social media of snow drifts being blown back onto the line as soon as the 37 has cleared them. Until that stopped passenger trains couldn't run as it's risked them being stranded in some very remote places. Running the 37 at least stops the accumulation of snow until the line is fit for passenger service.
 

Steddenm

Established Member
Joined
2 Mar 2017
Messages
1,250
Location
Clane, Co. Kildare
What's the significance of 16th January locally?
See this thread for the reasons why.

 

styles

Established Member
Joined
7 Dec 2014
Messages
4,878
Location
Gwynedd
See this thread for the reasons why.

This, though they are actually due in Wick Sheriff Court tomorrow at 10am as well.

Looks like the line has been reopened today but with delays.
 

Sealink

Member
Joined
16 Aug 2006
Messages
882
Location
Bridport
I was in Cairhness until today.
The 1041 from Inverness operated, arriving Wick at 1531.


The 1600 is planned to run too, albeit with no catering .


As I'm on the sleeper I couldn't risk waiting in case it's cancelled so got a lift to Tain then x25 to Inverness (£14 for the bus!).

Ember E6 and Stagecoach X99 cancelled today.
 
Last edited:

185143

Established Member
Joined
3 Mar 2013
Messages
5,359
They are planning to restore services.

If they're not running to Inverness on the 16th January it will cause some of the locals some disruption.
Very good!:D

Surprised they haven't kicked off about the noisy 37s rumbling past recently.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,282
I seem to remember that in BR days the one proper rotary snowplough they had was based in Inverness, which would have made short work of what is pictured above. Quite modern, I believe it was manufactured by Beilhack from Germany. Chris Green knew of it from his ScotRail days, when he moved to Network SouthEast and they were overwhelmed with snow in Kent once he arranged for it to come down the WCML at 40mph to dig them out. Given it was used just a few days a year, whatever happened to it?
 

DesDobramento

Member
Joined
12 Jun 2025
Messages
77
Location
Portugal/UK
The NSE one lived in the Southeast (Stewarts Lane?), lying unused for very many years before, I believe, moving to Scotland (? perhaps Perth ?)
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,308
Location
Glasgow
I seem to remember that in BR days the one proper rotary snowplough they had was based in Inverness, which would have made short work of what is pictured above. Quite modern, I believe it was manufactured by Beilhack from Germany. Chris Green knew of it from his ScotRail days, when he moved to Network SouthEast and they were overwhelmed with snow in Kent once he arranged for it to come down the WCML at 40mph to dig them out. Given it was used just a few days a year, whatever happened to it?
There are two snowblowers parked at Rutherglen, both are kept notionally operational.

The newer one you mention was last used in 2019 though. The other older one, goodness knows when.
 

Sealink

Member
Joined
16 Aug 2006
Messages
882
Location
Bridport
I seem to remember that in BR days the one proper rotary snowplough they had was based in Inverness, which would have made short work of what is pictured above. Quite modern, I believe it was manufactured by Beilhack from Germany. Chris Green knew of it from his ScotRail days, when he moved to Network SouthEast and they were overwhelmed with snow in Kent once he arranged for it to come down the WCML at 40mph to dig them out. Given it was used just a few days a year, whatever happened to it?

They sent a Class 37 up the line, which admittedly did the job (eventually) as trains are running again, but not the massive snowplough attached to the front of the engine that they were showing off on other lines.
 
Last edited:
Status
Not open for further replies.

Top