Altnabreac
Established Member
It's a bit much to describe Altnabreac as a 'community'.
That and Kildonan you could cut the service to fairly easily. A new Halkirk station would also probably halve Scotscalder's demand. That leaves you with Kinbrace, which in any case should definitely retain its current service pattern; a new siding and passing loop need to happen their quite soon and people do actually live there.
Invershin serves Inveran and together could probably retain its current service pattern. Culrain is tricky as that's all linked in with Carbisdale.
--- old post above --- --- new post below ---
And this is why passing loops are important; none of this can happen without a basic, functional service. The population between Inverness and the Dornoch Firth is quite high. The Invernet trains show that the demand is there. Let's put in the Lentran Loop, and perhaps another loop and cheapy Beauly-style platform at Evanton. Then we can focus on the rest.
Given Carbisdale has now been sold as a private residence I think it would be reasonable enough to close Culrain. Invershin has more prospect of tourist traffic with the Hotel and Bunkhouse and Culrain residents can still access the station via the footbridge connection over the Oykel viaduct.
Kildonan is the most obvious one to shut but as the FoFNL report points out there is only a journey time benefit if it is accompanied by an upgrade of the level crossing to improve line speeds.
Scotscalder, Georgemas Junction, Georgemas Curve and a new Halkirk station really all need to be approached as a joint project to improve journey times, probably with some rationalisation of private crossings in the area as well.
Altnabreac obviously I wouldn't want to see closed but given the new CWR in the area and improved line speeds at 90mph it may be that closure could be justified if a significant journey time improvement can be found.
Not sure if there is the political will to take any of that forward but taken overall it could all help with journey times.
--- old post above --- --- new post below ---
Is it on the cards? It's been claimed to be in this thread, but on a quick Google, I can't find any authoritative reference indicating that.
It was proposed as an option for funders to consider in the Scotland Route Study published earlier this year.
https://www.networkrail.co.uk/Scotland-Route-Study/
Enhancement of the line between Inverness and Wick/Thurso
The following interventions are proposed:
Inverness to Dingwall - additional loop to provide greater flexibility to pass trains
Dingwall to Invergordon - additional track to provide greater flexibility to pass trains
Re-signalling from Inverness to Dingwall - to replace the existing radio based system with a conventional signalling system arrangement
Georgemas Chord - to create new connection to facilitate a direct service to Thurso without the need to reverse at Georgemas Station.
So "On the cards" is a reasonable description. However by no means fully funded yet or guaranteed to happen.
--- old post above --- --- new post below ---
There was a report in the P&J yesterday about the lack of action at a level crossing where two people were killed ten years ago.
I find myself agreeing with the sentiment of the article as it appears that very little has been done about the level crossing.
Things really do seem to move very slowly on the railway at times.
I am really keen to see more people use the train but it's further and further behind road transport each day with new coaches, better roads and higher expectations. Apart from the price, there is little reason to take the train sometimes.
Situation at Delny is complicated. Network Rail wants to close the crossing but residents are opposed and prefer for it to be upgraded to AOCL+B. However there is currently a speed reduction in place to mitigate the risk until a solution is agreed..
The other complication is proposed housing development in the area and a proposed upgrade to the road junction with the A9 both of which could increase road traffic and mean an AOCL+B wasn't suitable anymore. The best solution is almost certainly closure but when communities fight it every step of the way they can hardly complain about the subsequent delays.
I think the only other AOCL left in Scotland is Dingwall No 1 where a similar development issue means the best long term solution is unclear.