D365
Veteran Member
- Joined
- 29 Jun 2012
- Messages
- 13,203
Even that's not much of a record. The only country with mainline 3rd rail running (i.e. 100mph) manages to get one of it's highest powered multiple units to do a fast run, just 9mph above normal linespeed. If one of the LNR Class 350/1 sets had shoes put back on (and any current software bars on DC running removed), it could do 110mph in service (PW dept permitting on 3rd rail).
Rather than add shoes to the class 350 units, could you not just update the software on class 444's or class 450 units, as they are all desiro units, just built at different times.
No you couldn’t, because there were also changes to the motors required to enable 110 mph running…
Ah, okay. But it would have to be a 350/1 unit that is equipped as any of the rest of the class 350's where not equipped with being able to run on 3rd rail.
Would there be any operational benefit to converting the Class 450/444 fleets to 110mph operation?
Not sure what @Robbies means by ”it would have to be a 350/1 unit”. Would this be part of the hypothetical speed record?
Further to this, if you really wanted to go ahead with this exercise; are you not forgetting a certain dual-voltage fleet that is already 110mph capable?