Harlesden
Member
Hypothetically,
what would be the longest and most convoluted route possible, using the same train throughout and making full use of the NR network, from London Kings Cross to Edinburgh?
The train should be moving forwards at all times and should not cover the same stretch of track in the same direction more than once.
What would be your preferred choice of diesel stock?
Assuming a station stop of 15-20 minutes every 4-5 hours for a crew change and passenger needs, where would these stops be?
QUESTION
Is the network still flexible enough - after Beeching's best efforts - for the train to touch Cornwall and go up through Wales whilst still proceeding in a forward direction at all times?
what would be the longest and most convoluted route possible, using the same train throughout and making full use of the NR network, from London Kings Cross to Edinburgh?
The train should be moving forwards at all times and should not cover the same stretch of track in the same direction more than once.
What would be your preferred choice of diesel stock?
Assuming a station stop of 15-20 minutes every 4-5 hours for a crew change and passenger needs, where would these stops be?
QUESTION
Is the network still flexible enough - after Beeching's best efforts - for the train to touch Cornwall and go up through Wales whilst still proceeding in a forward direction at all times?

