• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

(Fantasy) A through-running commuter rail tunnel for Birmingham

squingo44

Member
Joined
5 Jan 2026
Messages
173
Location
London
I tried coming up with the most reasonable way of getting all local services out of Birmingham New Street, freeing it up to run regional and intercity services more reliably. I came up with the following network, aiming to minimise the amount of tunnelling and the number of underground stations:

- Quadruple the track from Wolverhampton to Soho South Junction, from Bescot Stadium to Perry Barr North Junction, from Landor Street Junction to Water Orton East Junction, from University to King's Norton, and from Adderley Park to Rugby
- Build two tunnelled railways under Birmingham City Centre, from Soho South Junction to Adderley Park and from Church Road Junction to Duddeston
- Build three new underground stations: a Birmingham Central underground station with cross-platform interchange between the two underground lines and direct interchange with New Street, Moor Street, and Curzon Street, a Five Ways replacement station and a Ladywood station
- Expand the following stations with additional platforms and turnbacks to support terminating more services: Wolverhampton, Rugeley Trent Valley, Lichfield Trent Valley, Tamworth, Nuneaton, Coventry East (proposed), King's Norton, and Bromsgrove.

This builds on the Midland Rail Hub proposals to expand Moor Street station. It ought to leave most of the capacity on the existing lines free for new services, especially Birmingham New Street. In particular, it could support more Thameslink-style outer commuter services, such as Stafford-Rugby, Shrewsbury-Leicester, and Worcester-Derby.

Junctions such as Aston North, Water Orton East, Barnt Green and Soho South can be grade separated as necessary to increase service capacity.
 

Attachments

  • map.png
    map.png
    2.4 MB · Views: 39
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,624
Why would it make it more reliable, the nature of long distance services suggests that they get delayed getting to New St, not by it as a location.
Landor St to Water Orton is nigh on 4 tracked anyway and as for the others, taking the cross city out of the station isn't actually going to free a lot up. Adderley Park to Rugby is being 4 tracked, its called HS2. Bescot to Perry Barr is far from full. All of this would cost billions which would be better spent on finishing HS2.
 

Sprinter107

Member
Joined
26 Mar 2019
Messages
1,089
Between Five Ways and Bournville, the line is on the edge of the Birmingham and Worcester canal. Where are the extra pair of lines going to go ?
 

Top