trainmania100
Established Member
The 05.30 Brighton to Bedford service broke down earlier today on platform 4 of Brighton station. This train is still at the platform and will remain so until the end of service at which point our engineers will be able to safely move to the train to the nearest depot.
As its a 12 car this will be interesting to see. I didn't think anything longer than 12 car could manage on the 3rd rail?
I assume this will either be another 700 dragging it or a light locomotive to assist. I doubt a 377 would assist it.
As of 1500 it is still in brighton platform 4 on OTT maps
As its a 12 car this will be interesting to see. I didn't think anything longer than 12 car could manage on the 3rd rail?
I assume this will either be another 700 dragging it or a light locomotive to assist. I doubt a 377 would assist it.
As of 1500 it is still in brighton platform 4 on OTT maps