• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Fagersta Central PSB

Status
Not open for further replies.

Blillpers

Member
Joined
30 Oct 2012
Messages
53
Here are a few photos from my workplace in Fagersta Central PSB, Sweden. Commissioned in 1960 and controlling about 35 miles of mostly single track on two different lines, it is one of the smaller PSBs, but still a major junction. The switches on the main panel is used to set routes, while the lower ones are for setting individual points and release ground frames. The red switches are for cancelling routes and/or replace signals to red (without cancelling the route).

At Fagersta Central the Ludvika - Fagersta - Kolbäck (-Västerås) line crosses the single-track Krylbo-Frövi main line. The former has mostly passenger service, with an hourly Västerås-Fagersta service, extended to Ludvika 7 times per day. One service in each direction is through to Stockholm. The Fagersta - Ludvika section is worked by very traditional telephone block. The key you can see on the far left of the panel is used to clear the exit signal after receiving permission for a train from the next box down the line.

The main line has intense freight traffic, being a major north-south freight connection. It also has 6 passenger trains a day, with some occasional long distance sleeper services, mostly in the winter season. When these photos were taken, the main line was closed for planned engineering works, hence the collars.

All in all, we get about 90 through trains on a normal weekday, and plenty of ECS workings on that, bringing the total movements to well over a hundred.

As you can see in the photos, several shuntnecks, sidings, points, the parcels platform and one goods loop has been lifted. This happened during the 80s and 90s and as traffic has increased again we do miss some of these a lot. The box is sadly scheduled to close in late 2018, and control transfer to the regional control center in Gävle.

Comments and questions are welcome! :)
 

Attachments

  • 20170504_150616-1328x747.jpg
    20170504_150616-1328x747.jpg
    96.1 KB · Views: 20
  • 20170504_150628-1328x747.jpg
    20170504_150628-1328x747.jpg
    80 KB · Views: 13
  • 20170504_150642-1328x747.jpg
    20170504_150642-1328x747.jpg
    77.9 KB · Views: 13
  • 20170504_150658-1328x747.jpg
    20170504_150658-1328x747.jpg
    81.2 KB · Views: 13
  • 20170504_155020-1328x747.jpg
    20170504_155020-1328x747.jpg
    121.1 KB · Views: 12
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

godfreycomplex

Established Member
Joined
23 Jun 2016
Messages
1,750
Wonderful pictures - thank you very much! Sounds like you must be busy!
A couple of questions if I may
Will any of the layout be altered when control passes to Gävle - another loop; for example? Is the Ludvika line going to be resignalled at the same time? Also what's your procedure if the key that operates the exit signal should fail?
Thanks in advance! :)
 

Blillpers

Member
Joined
30 Oct 2012
Messages
53
It can certainly be busy at times. Relatively quiet mid-day, but in the mornings and late evenings when most of the freight comes through, it can be very hectic.

The only change I've heard about is that there will be a signal added in the west end of the yard (the track going straight up on the left end of the uppermost loop), as the yard is used for overnight EMU stabling. Currently we release the ground frames and the driver will then set the points him- or herself. A signal there will make this process a lot faster and propably also save the busy signaller in Gävle a few phonecalls.

Other than that we have suggested to have the pointwork connecting track 1 with the mainline going west reinstated (lower left, can be seen on the panel). It would make things a lot smoother. There are also plans to add a second main track to the west of the station itself, creating a longer section of double track, but that is further into the future.

The main line goes up a 7-mile 1 in 80 incline just outside Fagersta, and the heavy freight trains take their time to get up. A second track to keep trains in the other direction moving would be very useful.
 

godfreycomplex

Established Member
Joined
23 Jun 2016
Messages
1,750
7 miles at 1 in 80; wow; that must be fun when it rains!
That does sound like it would free up the layout a lot - especially being able to run straight through track 1 onto the main line whilst avoiding the pointwork - thanks for your reply
 
Status
Not open for further replies.

Top