Have just arrived in to plymouth, 1hr and 32 mins late! after battling Rattery Bank at no more than 5 MPH with serveral stops!! 43130 and 43152 working 1C89 1706 London Paddington to Penzance struggled to gain grip due to the severe rail conditions! i'd never seen a train go up that bank so sloww! Also 43130 was sparking as Metal and metal went together! On arrival at plymouth finally, i heard that the up london 1A35, stopped on Hermadon and the driver had to get out and put sand down!! just to get to the top of the bank! and this all after a day of Signal Failures and a 50mph TSR! As the dispatcher said at plymouth "after 8pm is all went pair shaped!!:roll:"