First phase , what would be the second phase ?
Doubling parts of Busby-East Kilbride and electrification.
First phase , what would be the second phase ?
Doubling parts of Busby-East Kilbride and electrification.
There still isn’t any peak time capacity at Glasgow Central though which has always been the flaw with the scheme. Either it needs to be a PRT system from Gilmour St to the Airport or someone needs to create a load more capacity at Central.
Because for me if you managed to create space for 4tph extra at Central I’d be looking to run 2tph to Largs, 4tph to EK and 3tph to Neilston with my extra slots rather than some slow short tram trains to the Airport that mess up capacity on the Paisley Corridor.
So to resurrect GARL you need to be creating 15tph extra slots at Central and you only get that with the cross Glasgow tunnel.
I think the case for Edinburgh Airport being linked up to the rail network is far stronger than Glasgow, due to it's location.
If anything was to happen for Glasgow then potentially some form of light rail link between there and the city, but that would be it.
It's a pet issue for the Evening Times, but I doubt many in the city are that bothered.
I agree. I just wish a decision would be made one way or the other so they can get on with it.
PRT..?
What is ideally required is for Glasgow to bring back trams. The Cathcart, Newton, and Neilston lines could be converted as part of a second phase after building a Glasgow Queen Street - Central - Broomielaw - Clyde Arc Bridge - Pacific Quay - Govan Cross - New Southern General Hospital - Braehead Centre - Renfrew Cross - Glasgow International Airport - Abbotsinch - Paisley Gilmour Street - Paisley Cross line. Being as the stations along the Cathcart, Newton, and Neilston lines are close together, this would be suitable for converting to trams.
All it requires for Glasgow and SPT to bring back trams is to get the people in who planned, designed, and constructed the Manchester Metrolink, as they are the experts and would make sure it is done properly at the first time of asking.
The downside of street running is that the rather than being a way to beat the traffic, the trams get stuck in it too.If there are to be light rail options on the south side of Glasgow, I'd suggest a tram option along main roads which would supplement existing transport provision.
'All it requires....' Hmm there's probably a lot involved in that, including costs of not only the work itself, but also hiring in the same experts. Then there's the question of whether they want to do it again, and given that Metrolink was first constructed and implemented in the 1990's, there's the issue that some of those same people could very well have retired by now.
I'm personally not in favour of converting the Cathcart Circle lines for Light rail. They perform their role perfectly well as heavy rail. If there are to be light rail options on the south side of Glasgow, I'd suggest a tram option along main roads which would supplement existing transport provision.
I'd further suggest that the biggest issue in Glasgow is not the level of transport provision - which is actually relatively good for a UK city although could do with some improvements - but ticketing. If we could get rid of the constant need to get separate tickets for one off journeys covering multiple modes of transport then it would be far easier for people.
The downside of street running is that the rather than being a way to beat the traffic, the trams get stuck in it too.
Which works well when you have wide streets, less so in UK cities where there often isn't even room for a bike lane.Modern tram networks minimise the amount of properly shared roadway - e.g. running down the central reservation, or off to the side.
This may very well be a good suggestion for general transport (although I'm not aware that anyone in a position of power is in favour of it). But the problem with this from the airport point of view is that the existing bus is relatively fast except when the M8 is jammed. Any stops other than perhaps one in Paisley would make an airport rail link uncompetitive, so it's difficult to include an airport service in an integrated network.What is ideally required is for Glasgow to bring back trams. The Cathcart, Newton, and Neilston lines could be converted as part of a second phase after building a Glasgow Queen Street - Central - Broomielaw - Clyde Arc Bridge - Pacific Quay - Govan Cross - New Southern General Hospital - Braehead Centre - Renfrew Cross - Glasgow International Airport - Abbotsinch - Paisley Gilmour Street - Paisley Cross line. Being as the stations along the Cathcart, Newton, and Neilston lines are close together, this would be suitable for converting to trams.
All it requires for Glasgow and SPT to bring back trams is to get the people in who planned, designed, and constructed the Manchester Metrolink, as they are the experts and would make sure it is done properly at the first time of asking.
Metrolink phase 3 finished three or four years ago, the Trafford line is still building, and West Midlands is in the early stages of a major expansion. Some of them have retired but others (including me) are still around...'All it requires....' Hmm there's probably a lot involved in that, including costs of not only the work itself, but also hiring in the same experts. Then there's the question of whether they want to do it again, and given that Metrolink was first constructed and implemented in the 1990's, there's the issue that some of those same people could very well have retired by now.
The reason to do this (and I repeat it's not any sort of official policy) would not be because the existing service was deficient, but because it's the shortest route out of Central, therefore the most appropriate for conversion to tram-train to free capacity there for longer-distance services.I'm personally not in favour of converting the Cathcart Circle lines for Light rail. They perform their role perfectly well as heavy rail. If there are to be light rail options on the south side of Glasgow, I'd suggest a tram option along main roads which would supplement existing transport provision.
If something like this were to happen, it would be far more likely to be an automated shuttle as they have at Gatwick and Birmingham and are building for Luton. True PRT with pods for about four people is superficially attractive but when looked at in more detail it's essentially a solution in need of a problem. There are good reasons why the concept of PRT has been around for nearly half a century but (depending on how you define it) there are no more than four PRTs in operation worldwide.Personal Rapid Transport. Running pods to St James has been considered though I’d rather they went to Gilmour Street.
The surcharge to the airport is due to the airport charging an access fee for the bus and tram, and yes it should be reduced to make the tram/bus more appealing. (info from this Edinburgh councillor:https://twitter.com/CllrChasBooth/status/1070788401656418305)
Metrolink phase 3 finished three or four years ago, the Trafford line is still building, and West Midlands is in the early stages of a major expansion. Some of them have retired but others (including me) are still around...
The reason to do this (and I repeat it's not any sort of official policy) would not be because the existing service was deficient, but because it's the shortest route out of Central, therefore the most appropriate for conversion to tram-train to free capacity there for longer-distance services.
"A" Missing !!!!!!!!!PRT..?
By all accounts this is the reason why tram and through ticketed rail fares from Edinburgh Airport to Gateway are so high. Quote from Ginaro's post in the Edinburgh Gateway 'White Elephant' thread from 12 December:
https://www.railforums.co.uk/threads/edinburgh-gateway-a-white-elephant.143148/page-9
Sorry?"A" Missing !!!!!!!!!
Which works well when you have wide streets, less so in UK cities where there often isn't even room for a bike lane.
Would the Mount Florida to Glasgow Central section of the line not want to be retained as a diversionary route for WCML services?
I see your point regarding motivations, however in Glasgow there is another available solution involving the City Union line becoming a cross-city (has been referred to as crossrail) line. The Cathcart lines don't have a link to it but the Paisley lines do and the Larkfield Curve could also be linked up - in fact a space was deliberately left in the M74 viaduct for this purpose. I'd argue that in terms of overall cost, if you want to free up space at Central then this would be more likely rather than conversion of the Cathcart Circle. If you do convert the Cathcart Circle lines to light rail, where do they go when they reach Muirhouse? Do they go on street? In that case you get the same objections regarding on street running as were made above - and how do they get on street?. Do they go underground? What is the cost of building a new tunnel underneath the city? I get that if you wanted to design the perfect transport network and cost wasn't an issue then yes, there is a certain appeal to conversion of those route to light rail, but I can't see it ever happening especially when there are perfectly good alternatives.
The point further above about specialised light rail vehicles as opposed to generic ones for all duties, up until now these lines have had units that were designed for a line such as this - quick acceleration and basic, high density seating with wide doors. Glasgow has plenty of routes that require this sort of unit, so it shouldn't be beyond the ken of ScotRail/Transport Scotland to provide something appropriate for this service. It is only now that we are seeing introduction of 90 and 100mph capable units on a regular basis. I would argue that when class 318 and 320s come to be replaced, there should be a 20m vehicle 3 or 6 car unit ordered that can be used on all suburban routes that largely remain in the immediate Glasgow area, including the Argyle Line, Balloch/Airdrie & Dumbarton/Springburn services, Cathcart Circle and Paisley Canal routes. Like an updated version of the 314s, as that's all that's really required for such routes.
As also pointed out above, conversion means you lose a WCML diversion route also. The big trains use it sometimes too.
The argument for conversion is that the current railways don't penetrate the major housing areas such as Castlemilk.
...If really required, you'd even be able to run longer formations of tram-trains into the high level platforms at Glasgow Central for handling peak loads.
Slightly longer than the 6-car EMU due to the narrower body and extra cabs. But to be honest if the optimum service is a 6-car every few minutes, the line probably isn't one for tram-trains. If the current service is a 6-car EMU every 20-30min then it might be possible to run a tram-train every 5min or so by avoiding the bottleneck of capacity at Central.How long would they be and how much capacity would they have compared to a 6-car EMU?
Slightly longer than the 6-car EMU due to the narrower body and extra cabs. But to be honest if the optimum service is a 6-car every few minutes, the line probably isn't one for tram-trains. If the current service is a 6-car EMU every 20-30min then it might be possible to run a tram-train every 5min or so by avoiding the bottleneck of capacity at Central.
Currently you have 4tph on the eastern half of the circle, 3tph on the western half of the circle (including 1tph going the long way round), 2tph on the Kings Park-Newton section and 2tph on the Muirend-Neilston section. Network Rail estimates that these frequencies will have to double by 2043 to meet forecast demand. So in the long term heavy rail will be providing 8tph on the busiest section and 4tph-6tph on the other sections.
That level of frequency combined with heavy rail comfort and capacity seems like the ideal outcome to me.
For a prototype in use at present look at Tokyo Yamanote line.Eleven coach basic one class only trains every two and a half minutes approx.
A West Lothian village is to be developed into a town with 3,000 new homes being built in a £1bn project.
Winchburgh will be extended over 15 years on 347-hectares (857 acres).
Winchburgh Developments Limited will go ahead after owners West Coast Capital (WCC) agreed a joint venture with Cala Homes.
As well as 3,450 homes and school buildings the plan includes improved transport links, a marina, a 75-acre park and 35 acres of employment land.
About 700 of the properties will be affordable houses of which 400 homes will be made available for social rent.
My first though on reading that was "a marina?!", but it makes sense given that a canal runs through it.It looks like Winchburgh station is going to happen now that the expansion of the Village has been agreed by the developers.
https://www.bbc.co.uk/news/uk-scotland-edinburgh-east-fife-46906369