Record has the same, https://www.dailyrecord.co.uk/news/scottish-news/old-rangers-train-station-reopen-12400639
As clc points out some naive quote
As clc points out some naive quote
A local councillor proposing the reopening of Ibrox station:
“It’s very easy to do. It wouldn’t take long. The tracks are there, it’s just a matter of the train stopping. How easy is that?
“I’m hoping that this will happen within the next year.”
Ah, bless!

That very much depends on the definition of 'soon', doesn't it?STV has a piece on tonights news that locals are under the impression that nothings going to happen anytime soon on the Levenmouth line
Cheaper per mile or cheaper overall? I'd be shocked if reopening 57km of a line that closed 40 years previous was cheaper than bringing 8km of a nominally open but out of use line back into use....suggesting it could be cheaper to re open than the Border line was.
It should cost less per mile to re-open most lines as they would not have the expense of temporarily diverting a major road (Edinburgh City Bypass), building a deviation for the railway, undertaking mineworking consolidation etc. Seems like somebody assumed that costs associated with the Borders Railway was to be the new standard rate for the job!Per mile.The article is referred to on BBC Scotland Edinburgh and South East news page
It should cost less per mile to re-open most lines as they would not have the expense of temporarily diverting a major road (Edinburgh City Bypass), building a deviation for the railway, undertaking mineworking consolidation etc. Seems like somebody assumed that costs associated with the Borders Railway was to be the new standard rate for the job!
Meantime there is more encouragement to be read here:
https://www.thecourier.co.uk/fp/new...st-case-for-reinstating-levenmouth-rail-link/
Cost per mile would be a good ballpark figure IF one could remove the extra costs associated with those elements I mentioned but I haven't see any.Agreed, but I think the cost of Borders can be used as a good "ballpark" figure, on the basis the outturn is likely to be less.
Network Rail’s proposals for step-free access to a new second platform at Dunbar Station have been approved by East Lothian Council.
The local authority has given the plans for new lifts and a footbridge at the station the go ahead.
Listed building consent has also been granted to demolish the old goods shed attached to the main building.
The new platform will provide increased capacity and improve operational flexibility at Dunbar.
Network Rail will appoint a main contractor later this year to develop the scheme in more detail, with a view to starting work on-site in 2019.
https://www.networkrailmediacentre.co.uk/news/new-second-platform-at-dunbar-moves-a-step-closer
Do you/we know which version is actually going to be built?I was looking for something else and noticed that Network Rail have announced planning permission has been granted for the down main platform at Dunbar, start on site next year.
No, I didn’t go as far as the local planning site, but what they wanted seems to be fairly well covered on the Network Rail website here: https://www.networkrail.co.uk/running-the-railway/our-routes/scotland/dunbar-station-new-platform/Do you/we know which version is actually going to be built?
Hmm... it looks like they went with the alternative location but it's hard to tell.No, I didn’t go as far as the local planning site, but what they wanted seems to be fairly well covered on the Network Rail website here: https://www.networkrail.co.uk/running-the-railway/our-routes/scotland/dunbar-station-new-platform/
PLANS for a Rail Link to Glasgow Airport remain on hold as councillors spend half a million pounds to address concerns with the project.
A report for Transport Scotland last year raised issues with the capacity of the rail network in the west of Scotland to deal with extra trains going from Glasgow Central Station to Paisley Gilmour Street before branching off to a new line and station at the airport.
Last year cash was held back from developing the rail link plans any further until concerns raised have been dealt with.
So far a total of £2million has been spent on the project.
The latest development is the first time any more money will be approved on the programme
For the last three months the Glasgow City Deal Cabinet officials have been meeting with Transport Scotland and the firm who produced the report to discuss how the concerns would be dealt with.
The flagship City Deal project has a budget of £144m and a Final business case was due in 2021.
Greengauge 21 - Beyond HS2
http://www.greengauge21.net/wp-content/uploads/Beyond_HS2WEB.pdf
- New high speed line from Rutherglen to Carstairs with a 125 mph spur to Shotts line near Breich (currently being examined by TS).
- New 125 mph line from Inverkeithing to Bridge of Earn & Cross Tay link towards Dundee.
- Carstairs - Edinburgh upgraded to 140mph.
- Upgraded Carstairs junction.
- New link between Carstairs - Edinburgh line and Fife line.
- New fast alignment south of Dunbar towards Newcastle.
![]()
Really I expect it all depends on the marginal cost of the higher line speed; you undoubtedly have a lot more freedom when building the line from scratch about design speeds. The differences for high speed are mostly in the centenary, and AIUI if you have a constant-height contact wire it's not too difficult even with multiple pantographs, and with no pre-existing structures to consider then it's easier to go for a constant-height contact wire?I think its sensible to show it as new line rather than new high speed line as well. No need for Fife to Perth to be 250mph. There might just be a business case for it to be at something like 140mph but even as a new straighter 125mph alignment the time savings would be significant.
That all seems sensible to me.That's the first time I've seen anyone other than me advocating the Cross Tay link at Bridge of Earn. I definitely think that it is the way to make a business case work for a new line from Inverkeithing to Perth.
The benefits are just to small for Perth and Inverness journeys only. Once you add in all Central Belt to Dundee and Aberdeen services as well then the benefits will much larger even if the costs are slightly higher too.
I think its sensible to show it as new line rather than new high speed line as well. No need for Fife to Perth to be 250mph. There might just be a business case for it to be at something like 140mph but even as a new straighter 125mph alignment the time savings would be significant.
I'm not sure that that's quite fair.Thats some fine crayon work there. I'll have a half pint of whatever they've been drinking.
I'm not sure that that's quite fair.
Where does £400M/mile come from?At a cost of £400m/mile that'd be around £10bn or £1.6bn per minute saved!
A High speed Rutherglen - Carstairs line, its 25 miles currently, average speed probably around 75mph so say 20 minutes? A high speed line is going to save what, around 6 minutes? At a cost of £400m/mile that'd be around £10bn or £1.6bn per minute saved!
The only one of those proposal even remotely likely would be the Edinburgh Perth and that's only Hilton to Ladybank can't be upgraded to a decent speed for a reasonable cost.