Are we likely to see any new or reopened stations this year?
I would have thought that Winchburgh would be impossible unless/until the Almond Chord had been built.
Because if you add more stops between Haymarket and Polmont junction then the next fast train will catch up before then.
BTW, the plan is that Dunblane trains will lose their stops at Linlithgow and polmont, these being picked up by the new service via Grahamston and Cumbernauld.
I am entirely supportive of Winchburgh station. It's a major argument for the Almond Chord.
As someone who lives in Linlithgow, that’s pretty disappointing that we’re going to lose direct trains to Stirling and have them replaced by a fairly pointless service. Will this be the case for Edinburgh Park too?
Also, if the Winchburgh station was to be built between the Almond Chord and Winchburgh Jn, then it wouldn’t really be worth building at all. That’s a fair bit out of Winchburgh, especially the new town centre.
Dalcross, Robroyston, Kintore, Winchburgh all looking like December 2019 at the earliest.
Auchenback is expected in 2021
East Linton and Reston are somewhere in the 2021 to 2023 range.
Nothing beyond those seven has funding yet. Most likely candidates are probably Cameron Bridge, Levenmouth, Dundee West, Bannockburn, Ravenscraig, Bonnybridge and Oudenard (Bridge of Earn).
Anything beyond those 14 seems unlikely to happen in CP6.
.
Ah, but it does then, in a roundabout way, honour the original EGIP commitment of 6tph between the two cities.Is it only me that thinks a 2tph E-G via FKG & Cumbernauld would be a bit of a waste? Cumbernauld is already well linked with a fast service to both cities in Croy, which I believe is why the usage at Cumbernauld and Greenfaulds is low. Springburn passengers for Edinburgh would be far quicker going to GLQ and getting a shuttle.
Ah, but it does then, in a roundabout way, honour the original EGIP commitment of 6tph between the two cities.
Is it only me that thinks a 2tph E-G via FKG & Cumbernauld would be a bit of a waste? Cumbernauld is already well linked with a fast service to both cities in Croy, which I believe is why the usage at Cumbernauld and Greenfaulds is low. Springburn passengers for Edinburgh would be far quicker going to GLQ and getting a shuttle.
Imagine how slow this stopper would be end-to-end. It barely has a purpose for intermediate to intermediate calls either
Also, if the Winchburgh station was to be built between the Almond Chord and Winchburgh Jn, then it wouldn’t really be worth building at all. That’s a fair bit out of Winchburgh, especially the new town centre.
I think that the new town centre is supposed to be to the north of the existing village on the west bank of the Union Canal and on the planned new road linking the town to the new junction on the M9. That road also connects to the planned Winchburgh Station 'Park and Ride'. Splendidly joined up thinking!
If it were possible to build Winchburgh station on passing loops, would there be any timetable benefits, or would this generally slow down services? I suspect that the time taken to loop a train would outweigh any advantages.
I'm a bit mystified. If it's on the west bank of the canal it's quite a way from the tracks; North of the tunnel there is a substantial park/loch between the East bank of the canal and the tracks. However on Google maps there is a field to the east of the line, which although still cultivated, is also marked with a street layout.
Background
At both strategic (South East Scotland Strategic Development Plan 2013) and local (Midlothian Local Development Plan 2017) planning levels, the A701 road corridor is identified as a growth area. The committed levels of development arising within this growth corridor include major housing at Bilston, Roslin and Penicuik, together with substantial retail and commercial development at Straiton. The most recent Census data (2011) indicates that around half of the workforce living in Penicuik travel to jobs in the Edinburgh area; there is no definitive evidence to suggest that this level of commuting would have altered significantly since 2011, nor that it will continue at a similar rate.
In recognition of this level of growth, the Local Development Plan includes a proposal for a new A701 relief road and A702 spur road, the former running to the west of the existing A701 to act as the main link for traffic between Penicuik and the A720 Edinburgh City Bypass. This will enable the existing A701 road to be re-prioritised as a public transport corridor, as well as a safer and more attractive route for cyclists and pedestrians. There has also previously been reference to the possibility of a light rail link along the A701, an extension of the Edinburgh tram network, and a link to the orbital bus proposals along the A720 City Bypass.
The proposal to re-establish a heavy rail link between Penicuik and Edinburgh has been considered by the Council since at least 2001, when a bid to the then Scottish Executive for funding for a feasibility study into the matter was submitted, but which was unsuccessful. More recently, in August 2012 and February 2013 the Council considered further reports on the Penicuik Rail Line which maintained the Council’s continued interest in considering the project. Heriot Watt University undertook a Governance for Railway Investment Projects (GRIP) Stage 2 Engineering Study in 2014, followed by a GRIP 3 Engineering Study shortly afterwards. That latter study recommended that further development to GRIP 4 stage be undertaken specifically to examine a route running from Pomathorn Road north eastwards along the track of a former railway through Rosslynlee, past Rosewell, and through Bonnyrigg, to link into the Borders railway line close to Eskbank Station. Since then no further work has been undertaken.
In resolving to adopt the Midlothian Local Development Plan at its meeting on 26 September 2017, Council agreed that “Further reports be brought forward in relation to a feasibility study in respect of a rail link to Penicuik.”
Summary
The potential for a heavy rail link between Penicuik and Edinburgh has been under consideration for many years, although there has been little progress since 2013/14. The scale of forthcoming development approved in the new Local Development Plan for Penicuik and the A701 corridor is such that further consideration could be given to the potential to maximise the public transport link opportunities, including that of heavy rail.
Recommendations
It is recommended that Council,
i) agrees to receive a more detailed report on the relative merits of options to maximise the capacity and quality of public transport links between Penicuik and Edinburgh; and
ii) receives a report which reviews in more detail the work already undertaken on the feasibility of a heavy rail link between Penicuik and Edinburgh, together with an assessment of the next stages in assessing the merits of such a proposal.
From a quick NLS Maps survey it seems that a large part of the original route is built on, so would I be correct in assuming that any link would be mostly new-build?Link to a Midlothian Council meeting, regarding the reinstatement of a heavy rail link to Penicuik:
Penicuik to Edinburgh - Public Transport Links and Rail Feasibility Assessment - report by Head of Communities and Economy
I think that the new town centre is supposed to be to the north of the existing village on the west bank of the Union Canal and on the planned new road linking the town to the new junction on the M9. That road also connects to the planned Winchburgh Station 'Park and Ride'. Splendidly joined up thinking!
If it were possible to build Winchburgh station on passing loops, would there be any timetable benefits, or would this generally slow down services? I suspect that the time taken to loop a train would outweigh any advantages.
Also, there's not much in the way of clearance.Found this video on Facebook: http://sendvid.com/qbm07a92 which shows the tracks within Kinghorn Tunnel - knew there was a kink but hadn't seen how bad it was!
The tunnel is (from memory) 30mph so it would save a minute or two if you had a clear run of 60mph from Burntisland through the tunnel and heading out of Kinghorn.The line speeds are 65 from Burntisland and 45 to the east through Kinghorn station. Of course there will need to be track lowering works for electrification, but what speeds could be gained by also reboring the tunnel and would it be worth it?
Inverkeithing-Halbeath is just a crayonista's fantasy ignoring the basic laws of physics ..... so a DFT dream project. There is also Cowdenbeath to sort out given the sharp curve from where the Glenfarg line carried on if the 'top' side of the Fife circle is to be the main route. Lots of mine workings to resolve whatever you want to do in that part of Fife so I suspect the coast route will be improved eventually but Fife will be the last route to get wires so expect a bimode HST replacement.
Nothing beyond those seven has funding yet. Most likely candidates are probably Cameron Bridge, Levenmouth, Dundee West, Bannockburn, Ravenscraig, Bonnybridge and Oudenard (Bridge of Earn).