Something to remember is that the Hybrid Bill process is only required for the railway works, not for any over-site development. The Option 8 station in the Hybrid Bill is little more than a half-completed Option 1 and anything that could have been built over the HS platforms in Option 1 can be built over them in Option 8. The Hybrid Bill and the Environmental Statement include the possibility of OSD but all that they are required to do is provide the concrete slab. The actual planning of the OSD would be done entirely through standard planning procedures.
There are limits to how many floors can be put above Euston, both physical/engineering and for townscape issues. The various plans for Euston have all had to deal with the protected sight line from Primrose Hill to St Paul's Cathedral which limits any over-site development through the middle of the site to about 10 stories. From an engineering perspective it will be easier to locate taller structures on the top of the cutting as the supports can be larger and there is no underground station beneath.
A particular idea that I feel is suitable is that there would be some sort of north-south route along the entire cutting. In the Option 1 plan this is well provided for as there is to be a wide street-level concourse area dividing the HS2 and classic platforms running all the way from Euston Square to the east-west bridge just north of the station. Constructing a slab above the widened station throat and cutting, even if only strong enough to carry 3 or 4 stories, would allow this pedestrian route to continue all the way along the cutting.
The newspaper article mentioned the St Pauls view issue and said that it would not be in a direct line of site but to the west. Looking at Google maps that does appear to be the case.
I do agree there are other issue though, especially building foundations for such a building.
Now, I don't know whether we are talking about tall stories or storeys and sites or sights. usw. (and so on and so forth). et cetera.
Vroooooooooomh...............!
In a letter sent to Cllr Sarah Hayward on Monday, Mr McLoughlin MP wrote: “Experts from HS2 Ltd and Network Rail have looked at this in detail and have provided strong and definitive adivce that the ‘double deck down’ solution is not viable.
“On the basis of this advice [...] the Department intends to do no further work on the ‘double deck down’ solution.”
An attached letter sent by Rupert Walker, head of high speed rail development at Network Rail, listed a number of concerns about DDD2, including fewer opportunities for “over site development”, the impact of construction on rail capacity and reduced concourse and passenger circulation.
Seems that the SoS made an annoucement in early August, during the silly season of course, ostensibly about Crossrail going to Tring.
LR doesn't believe that. They reckon it's about removing the slow commuters from the WCML to relieve Euston so its re-building can be speeded up. Crossrail is far less controversial than HS2. Crafty dog! Wonder who will pay for this?
http://www.londonreconnections.com/2014/coming-across-rail-turmoil/
It was hardly news, it was in the 2011 London and SE RUS, and as described there is is about improving journey times to central London and the City for WCML commuter services. They emphasised back then that the proposal has a positive BCR without considering the effects of HS2 on Euston. I suggest there's no big conspiracy about HS2 going on.
All that happened in August was that a consultation on the details was announced. The current thread about Old Oak Common has some detailed drawings of the proposed route for the link - the suggestion is that NR and HS2 must have been looking at the details for some time.
The latest news regarding Euston redevelopment - from minutes of a meeting on teh 9th October 2014:
http://www.railforums.co.uk/showpost.php?p=1982033&postcount=139

And oh yes, you Londoners have excelled in this one..
)Ok, I'm just a stray Aussie and this is my first post so be nice
I couldn't help notice the discussion about Euston station (I've been there a few times). And one of my fascinations is with the game called "Concrete Twister". You know like the old fashioned Twister party game, only you play it with multiple layers of infrastructureAnd oh yes, you Londoners have excelled in this one..
Having had a read through the DDD proposal and the feasibility study it does occur to me that the only way out of this jam is to back up one step. And that's to shut down Euston. But not before putting something else in its place to serve much the same function, at least temporarily.
I'm not sure about the discussion about Crossrail 2 etc. But what I was actually thinking was this.
Is is possible to actually build a new, temporary version of Euston station. Or even a not so temporary version. I might leave you guys to speculate on this but just looking around I have a few ideas. And I should point out that for the amount of time, energy and cost that could be saved it would be worth throwing in a new tunnel.
First random idea: the south eastern corner of Regents park. Ok, so you'd have to manage the trees carefully, but you could build a temporary station and it would be connected to Regents Park tube station. If you wanted to make this permanent you could even stick the whole thing in a box and put the park back on top.
Second random idea: up at the corner near Chalk Farm and near a place called the Roundhouse. This one would be temporary for sure. And I don't know much about the surrounding buildings but I'm sure a temp station could be squeezed in here.
Third random idea: how about a tunnel extension heading south to a new Euston station. This time under Russell Square and taking up the two blocks to the north of it. The Royal National Hotel (judging by the last time I stayed there) could do with some aggressive renovation. Please don't tell me its heritage or I'll cry.. Anyhow its worth a thought. I'm just putting forward a concept.
Anyhow, if you can move Euston station then the rest falls into place fairly easily.
Cheers (don't forget to send me my consultants fee)
This wouldn't be a 'temporary' station because the cost of building it would be so immense there would never be a business case in demolishing it again. This permanent solution was one of the final proposals then rejected in favour of Euston, and it is realistically the only possible option for a future high speed rail terminus in London, so do not discount this happening at some point.
The issue here is that there isn't enough land available for there to be enough platforms for it to be worth doing. If divine chance meant there was a King's Cross Railway Lands-style area of derelict land on the same level as and adjacent to the Euston throat it would be a realistic possibility for a new set of permanent platforms, leaving the existing Euston land available for the high speed platforms. This wouldn't be dissimilar to how St Pancras was reconstructed, when the MML Fast line platforms were moved out into their current new terminus away from the trainshed so that the very intensive works could be done there without any disruption to services.
The reason the north London terminals are where they are is that Parliament did not allow the railway companies to build them south of Euston Road. Building a new terminus south of there would be effectively impossible, given that any new terminus would have to dwarf the surrounding area and there are no real areas available for that level of regeneration (indeed, is there any place in Zone 1 that needs regeneration?). The only reason new railway lines would be built south of Euston road is to build cross-city links and HS2 simply does not work with them given that London is tucked in one small corner of the island and the Continent is in a different passport zone. I do think though that high speed rail to the west and the north east is going to be needed in the same general time frame and it would be a good idea to share one single station box in a Royal Park for both, allowing services to continue through London from one extreme of the country to another.
Camden Journal is saying there has been a triple U-turn and the plan is now a phased approach to build a new station box beside the existing station containing six platforms and open by 2026 and then in 2034 to extend 5 of the existing platforms to HS2 length.
![]()
Quote from 26th November 2014:
"StP has what? Four Euro* tph and five international platforms. There are, at least, four suitable platforms extant in London and no suggestion of using them.
Extend Euston on the west side only, using the carriage shed space and some significant demolition. Insert 4 to 5, 415m platforms, on west side at existing gl. Thus 8/10 tph to EUS. Might just get away with that politically. Construction period becomes acceptable too.
Then 2 to Waterloo via the WLL; will require gauge clearance for Captives but not for CCs. 2 tph to StP Euro* platforms via NLL; maybe reverse onto HS1 from there. Move the security fence usw. 2 direct to Stratford or Ebbsfleet or beyond. Accept 2 or 4 tph turning back at OOC for now (if run at 18 tph), and most pax having to change there. They probably will anyhow. Wonderful dispersal.....
It's a no-brainer. 6 is possible and will take the initial service.