Why do they need that massive tall wall put up just to dismantle the boards. That seems like a massive overkill. Surely just some simple temporary barriers (like what gets used for temporary queueing systems) would have been far cheaper and quicker to set up.At Euston today looks like they dismantling the "new" departure screens. Screens removed & contractors removing wiring
Awesome. I was there on the night they were being put up, I remember it was a described as a 'trial'.
The main reason I didn't like them is that they had different info on each side, e.g. train times on one side and disruption advice on the other, meaning you had to circle them to get the full message. Very inefficient compared to having all info on one plane.
I assume as they are taking off screws, nuts & bolts, pulling out wires etc and also using lift ladders working at height to dismantle the pillars & framework that there is the risk of bits flying off in all directions or parts dropped so Health & safety will dictate that boards are neededWhy do they need that massive tall wall put up just to dismantle the boards. That seems like a massive overkill. Surely just some simple temporary barriers (like what gets used for temporary queueing systems) would have been far cheaper and quicker to set up.
But good to see them taken down. It will add less clutter to the concourse. They should never have replaced the large main boards in the first place.
I think a train had failed in the station so stepping up setsOT - I note from the second photo 6 mins until departure time that the 1341 Liverpool doesn't have a platform on the screen yet!
Why do they need that massive tall wall put up just to dismantle the boards. That seems like a massive overkill. Surely just some simple temporary barriers (like what gets used for temporary queueing systems) would have been far cheaper and quicker to set up.
But good to see them taken down. It will add less clutter to the concourse. They should never have replaced the large main boards in the first place.
Looking at the photo, they would need that much space to move those elevating platforms around, particularly if one needed to drive round to the other side of the screens.I assume as they are taking off screws, nuts & bolts, pulling out wires etc and also using lift ladders working at height to dismantle the pillars & framework that there is the risk of bits flying off in all directions or parts dropped so Health & safety will dictate that boards are needed
Where will they end up, are there any places where they would make an actual improvement. Surely they won't just be dumped.
I note Network Rail hired a new "Head of Station Operations" for Euston whose main work seems to have been undoing all the disastrous decisions from the last couple of years and implementing many of the common-sense approaches (like earlier boarding) that most of the forum had identified.
Maybe at Paddington?Where will they end up, are there any places where they would make an actual improvement. Surely they won't just be dumped.
It was as much of a "trial" as the LNER fare increase one - but at least common sense has prevailed here!
Thinking back it took a change of government to make this happen.
Correct - a lot of advertising revenue lost.and millions wasted along the way.
Correct - a lot of advertising revenue lost.
I am in Euston several times a week so the changes with screens didn't really bother me. What bothers me more is the underground entrance/exit layout. The flow of people doesn't seem to work properly.However, if you're actually suggesting it was a good idea, I'm going to suggest you spend too much time going Fenny<->MKC and don't use Euston enough to know how much of an utter disaster this change was for the station.
I am in Euston several times a week so the changes with screens didn't really bother me.
What bothers me more is the underground entrance/exit layout. The flow of people doesn't seem to work properly.
the screens were/are much easier to read than the ones they replaced. They are clear, bright, colourful and helpful - they were just in the wrong place.Odd, as to me it was the most stupid thing that has ever been done to the station, it caused all manner of problems with flows into, out of and around the station, particularly when busy.
They have.........lots and lots of trains now board 20 minutes or longer before departure time.Are they going to address the scrum next, or is that wishful thinking?
How does the the current big screen compare for legibility with the one in the same place that was replaced?the screens were/are much easier to read than the ones they replaced. They are clear, bright, colourful and helpful - they were just in the wrong place.
They have.........lots and lots of trains now board 20 minutes or longer before departure time.
Oh much better - it what should have happened in the first place!How does the the current big screen compare for legibility with the one in the same place that was replaced?