I really object to the countdowns when this is the station with the worst record of late announcements. The same with the no running signs.The countdowns would be fine if they were correct, but they're not, they are to departure, not to 2 minutes before (Avanti)/30 seconds before (LNR).
As a passenger, these new departure boards are far more convenient - especially the ones outside.
I don’t get the love for the big board it replaced. The station passenger flow is so much better during normal times.
As a passenger, these new departure boards are far more convenient - especially the ones outside.
I don’t get the love for the big board it replaced. The station passenger flow is so much better during normal times.
I'm not sure anyone's saying they loved the old one? However the decision to install four smaller sets of screens is a bit baffling.I don’t get the love for the big board it replaced. The station passenger flow is so much better during normal times.
Yes. Or they could have just put the new screens up in the same location as the existing.It's nice having them outside, but that could have been done without touching the one inside.
Yes. Or they could have just put the new screens up in the same location as the existing.
The new boards at Euston are much brighter, more colourful and much easier to read than the old ones
I will chip in with my usual statement:
The new boards at Euston are much brighter, more colourful and much easier to read than the old ones
I KNOW this goes against what all the cool kids think but so be it. I know posters here find change very hard to deal with but my only criticism is the location otherwise i am very impressed with the new boards. Unsure how the outside ones will work but they will be useful for users of the cancer garden or fast food eateries in the courtyard.
Not sure I'm seeing much criticism of the boards themselves, and the outdoors ones are a welcome addition. The location of the new ones on the concourse is the major annoyance. It feels like a backwards step.
No doubt something like that.I assume they wouldn't put new ones in the place where the old ones were because they want that latter space for massive in-yer-face adverts. Commerce trumps passenger usefulness of course.
I think basically everyone has said that the format is better for the reasons given. The same at London Waterloo and London Victoria.I totally agree on the format (the one thing I'd change is "Wait" to "Please wait" - it's too blunt).
Precisely.Not sure I'm seeing much criticism of the boards themselves, and the outdoors ones are a welcome addition. The location of the new ones on the concourse is the major annoyance. It feels like a backwards step.
I totally agree on the format (the one thing I'd change is "Wait" to "Please wait" - it's too blunt).
They are however utterly in the wrong place inside, and don't have quite enough panels.
== Doublepost prevention - post automatically merged: ==
It's totally wrong. If they insist on having that type of board, one in the middle would be best.
There always seems to be a fear of commands. The most common fault is putting 'customers should do this' or 'you should do this' instead of just 'do this'. Perhaps people worry that commands sound too harsh. But you can often solve this by putting the word 'please' in front. However, if something must be done, it is best not to say ‘please’ as it gives the reader the option to refuse the request.
I'd bet 'Wait' vs 'Please wait' was debated during design. However, people generally respond better to blunter commands.
Re: locations, totally agree. The outside one is very handy, but indoor ones seem oddly positioned. Especially as the screen closest to and pointing towards M&S never seems to show anything.
At smaller stations, CIS screens on platforms are sometimes placed away from the ends of stair and things in order to 'pull' people along the platforms. But I can't work out what they were trying here.
Money talks, and is the rather obvious focus, rather than delivering on improving customer service.So the scaffolding has been took down to reveal a massive adverting screen, which will no doubt be blinding bright..
Some absolutely ridiculous decisions and designs being made here at Euston.
I can’t wait to see this used on an advertising task on The Apprentice.So the scaffolding has been took down to reveal a massive adverting screen, which will no doubt be blinding bright..
Some absolutely ridiculous decisions and designs being made here at Euston.