As we approach the 30th anniversary of the launch of Eurostar services from London to Paris and Bruxelles, here is a tale of an event which took place ahead of the official opening.

Saturday 11/06/94
43140 + 43125 0700 Reading – Paddington
I made my way by tube to Waterloo, as I had been invited (with several hundreds of other people) to join an Evacuation Test train going from Waterloo to Coquelles and return.

E* 3215 + 3216 0928 Waterloo – Coquelles Emergency Siding

Things didn’t get off to a good start when the original Eurostar set failed, so 3215 + 3216 were hastily summoned from North Pole Depot. We got under way an hour late. This was my first ever trip on a Eurostar set – the first of many. I was impressed by the train itself, but rather less so by the low speed meandering through the Southern Region suburbs of London. We ran via Maidstone, and into the Channel Tunnel for my first rail crossing under the English Channel.

The purpose of the trip was to test evacuation procedures, in the event of a train becoming disabled mid-tunnel and requiring emergency evacuation. This was required to be successfully completed for the Operating Licence to be issued. We came to a (planned) halt mid tunnel, then the traincrew went through the full emergency drill. A “replacement” Eurostar was sent from Calais to stop in the opposite tunnel, for a simulated transhipment of the passengers. So we all trooped off our train and into the service tunnel, hung around there for about half an hour, then were invited to re-board our original train so we could continue to Coquelles.

Having reached Coquelles, we reversed, and set off back towards the UK. There was a surprise at the French tunnel mouth, as SNCF steam loco 230 G 353 was posed in the tunnel mouth for photographs. Apparently, it had been right into the tunnel as far as the French crossover earlier that day to test the fire alarm system!

That’s when the fun and games really began. You see, when we had stopped opposite the steam loco to allow everybody to get photos of it, we were straddling the neutral section. When attempting to take power after the photo stop, the class 373’s power control system had “timed out” and required to be reset. Now I am by no means an expert on these things, so please forgive me if I’ve got the technical details wrong, but basically the driver did a pantograph reset, then took power once again. We accelerated a short distance then BANG! There was a loud bang and a flash, and the overheads came down. Normally when entering a neutral section the Automatic Power Control magnets shut the power off, but by sitting at the tunnel mouth for a while then doing a pantograph reset, our rear pantograph was drawing full power as we entered the Channel Tunnel. As we reached the neutral section an arc was drawn, enabling both 29 kV to feed at different phases simultaneously. The resulting power surge / clash of phases was enough to melt the OLE contact wire, leaving us powerless straddling the tunnel mouth.

Our “simulated emergency” test train was now a genuine emergency. Thankfully, help was at hand. Eurotunnel sent one of their diesel locos through the tunnel to rescue us, and the SNCF and Eurotunnel staff secured the damaged OLE equipment.

E* 3216 + 3215 1600 Coquelles Bomb Siding – Waterloo (75 minutes late start)
Mak 0004 1946 French Tunnel Portal – French Crossover

Once we reached the French crossover, we were back under live OLE again, so the ET diesel detached there, and the Eurostar continued with only one power car working as far as Dollands Moor. Having reached third rail territory, both power cars were able to power the train. Because by now we were running several hours behind schedule, some people were concerned about getting home from Waterloo that same night. The train crew arranged for the special to stop additionally in the (domestic) platforms at Ashford - presumably the first Eurostar ever to do so. (This was well before the official opening of the Eurostar platforms at Ashford International, which didn’t take place until 1996). We arrived at Waterloo (via Maidstone) at 22:00, so I did well to make the 22:30 out of Paddington. It had been a long and eventful day.
43183 + 43181 2230 Paddington – Reading

A full post mortem (or “retour d’experience” as our French colleagues would call it) was carried out by Eurostar and Eurotunnel the following week. The procedures for resetting power if you become stopped straddling a neutral section were clarified, to prevent any repetition of our OLE destruction.

That was the only time I had any of the Eurotunnel diesels for haulage. To the best of my knowledge, Saturday 11/06/94 was the only day in which steam, diesel, and electric traction all worked in the Channel Tunnel.

It is strange to think that the class 373 Eurostars are now 30 years old, and have clocked up many millions of miles. They are still pretty good trains.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

CW2

Established Member
Joined
7 May 2020
Messages
2,222
Location
Crewe
How did it get that name?

Interesting post by the way!
Thanks.
I believe that as the Channel Tunnel was designated as a piece of key infrastructure, there were special measures included at the design stage in the event of a bomb alert for a train approaching. This included a special siding at Coquelles where a train could be stopped, evacuated, and searched by the French bomb squad. It probably has a proper French name, but I always knew it as "Coquelles Bomb Siding."
 

Wandering Pom

Member
Joined
23 Mar 2024
Messages
163
Location
Cambridge
Railway Track Diagrams shows a "voie d'urgence / emergency siding" at Coquelles, conveniently located for a train coming out of the Tunnel, but some distance from all the other facilities in the area. There is also an "emergency siding" shown at Cheriton, but alongside the loading/unloading area.
 

CW2

Established Member
Joined
7 May 2020
Messages
2,222
Location
Crewe
Railway Track Diagrams shows a "voie d'urgence / emergency siding" at Coquelles, conveniently located for a train coming out of the Tunnel, but some distance from all the other facilities in the area. There is also an "emergency siding" shown at Cheriton, but alongside the loading/unloading area.
Thanks for the clarification.
 

D7666

Member
Joined
12 Aug 2013
Messages
997
As we approach the 30th anniversary of the launch of Eurostar services from London to Paris and Bruxelles, here is a tale of an event which took place ahead of the official opening.

Saturday 11/06/94
43140 + 43125 0700 Reading – Paddington
I made my way by tube to Waterloo, as I had been invited (with several hundreds of other people) to join an Evacuation Test train going from Waterloo to Coquelles and return.

E* 3215 + 3216 0928 Waterloo – Coquelles Emergency Siding

Things didn’t get off to a good start when the original Eurostar set failed, so 3215 + 3216 were hastily summoned from North Pole Depot. We got under way an hour late. This was my first ever trip on a Eurostar set – the first of many. I was impressed by the train itself, but rather less so by the low speed meandering through the Southern Region suburbs of London. We ran via Maidstone, and into the Channel Tunnel for my first rail crossing under the English Channel.

The purpose of the trip was to test evacuation procedures, in the event of a train becoming disabled mid-tunnel and requiring emergency evacuation. This was required to be successfully completed for the Operating Licence to be issued. We came to a (planned) halt mid tunnel, then the traincrew went through the full emergency drill. A “replacement” Eurostar was sent from Calais to stop in the opposite tunnel, for a simulated transhipment of the passengers. So we all trooped off our train and into the service tunnel, hung around there for about half an hour, then were invited to re-board our original train so we could continue to Coquelles.

Having reached Coquelles, we reversed, and set off back towards the UK. There was a surprise at the French tunnel mouth, as SNCF steam loco 230 G 353 was posed in the tunnel mouth for photographs. Apparently, it had been right into the tunnel as far as the French crossover earlier that day to test the fire alarm system!

That’s when the fun and games really began. You see, when we had stopped opposite the steam loco to allow everybody to get photos of it, we were straddling the neutral section. When attempting to take power after the photo stop, the class 373’s power control system had “timed out” and required to be reset. Now I am by no means an expert on these things, so please forgive me if I’ve got the technical details wrong, but basically the driver did a pantograph reset, then took power once again. We accelerated a short distance then BANG! There was a loud bang and a flash, and the overheads came down. Normally when entering a neutral section the Automatic Power Control magnets shut the power off, but by sitting at the tunnel mouth for a while then doing a pantograph reset, our rear pantograph was drawing full power as we entered the Channel Tunnel. As we reached the neutral section an arc was drawn, enabling both 29 kV to feed at different phases simultaneously. The resulting power surge / clash of phases was enough to melt the OLE contact wire, leaving us powerless straddling the tunnel mouth.

Our “simulated emergency” test train was now a genuine emergency. Thankfully, help was at hand. Eurotunnel sent one of their diesel locos through the tunnel to rescue us, and the SNCF and Eurotunnel staff secured the damaged OLE equipment.

E* 3216 + 3215 1600 Coquelles Bomb Siding – Waterloo (75 minutes late start)
Mak 0004 1946 French Tunnel Portal – French Crossover

Once we reached the French crossover, we were back under live OLE again, so the ET diesel detached there, and the Eurostar continued with only one power car working as far as Dollands Moor. Having reached third rail territory, both power cars were able to power the train. Because by now we were running several hours behind schedule, some people were concerned about getting home from Waterloo that same night. The train crew arranged for the special to stop additionally in the (domestic) platforms at Ashford - presumably the first Eurostar ever to do so. (This was well before the official opening of the Eurostar platforms at Ashford International, which didn’t take place until 1996). We arrived at Waterloo (via Maidstone) at 22:00, so I did well to make the 22:30 out of Paddington. It had been a long and eventful day.
43183 + 43181 2230 Paddington – Reading

A full post mortem (or “retour d’experience” as our French colleagues would call it) was carried out by Eurostar and Eurotunnel the following week. The procedures for resetting power if you become stopped straddling a neutral section were clarified, to prevent any repetition of our OLE destruction.

That was the only time I had any of the Eurotunnel diesels for haulage. To the best of my knowledge, Saturday 11/06/94 was the only day in which steam, diesel, and electric traction all worked in the Channel Tunnel.

It is strange to think that the class 373 Eurostars are now 30 years old, and have clocked up many millions of miles. They are still pretty good trains.
I was on that exercise too

Report is as I remember it except my only difference comment is in the first part where we did the simulated evac the other (replacement) train brought into the tunnel (the one we did not use) was not a Eurostar but BB22200s on Corail stock; Eurotunnel (not Eurostar) had a number of BB22200 (not the ones that worked freight) for test purposes and a hired in Corail stock both for general train testing and for /possible/ standby use (which never happened); don't forget in tunnel rescues are responsibility of Eurotunnel to deploy whatever effective means they have on hand with their resource.

My record says diesel 0004 worked from 60.5 km marker to 45.2 km to marker; given that a 373 train itself is ~0.4 km long one could debate if mileage down to the nearest 0.1 km makes any sense.

A few months later 14/01/95 there was another Eurostar evac exercise that I was on; 373003 + 373004; overall less interesting but got us a 373 into Cheriton Eurotunnel, after first entering tunnel then reversing out to Cheriton, and then via Kensington Olympia full evac. the latter being a planned passenger diversion terminal (and again never used as such).

On the 1st exercise we did indeed go to the Coquelles voie d'urgence and the 2nd exercise to the Cheriton emergency siding

30 years ago time flies.

One other anecdote from those exercises was we got free food; they were in fact standard airline at seat tray meals ( in the good old days when that was normal) but interestingly in SAS (Scandanavian aAirlines) packaging but otherwise a bog standard Heathrow tray meal; that did mis lead me a bit when later on did my first proper Eurostar travel as I thought getting a tray meal was going to be part of the normal service, especially as one of the big launch campaigns was similar but different to flying.

And of course me being me I have had 319s into tunnel as well, on the Sandling Holywell shuttles 07/05/94.

Wonder if HS2 opening will see similar events. HS1 didn't do anything to rave about.
 
Last edited:

CW2

Established Member
Joined
7 May 2020
Messages
2,222
Location
Crewe
@D7666
Thanks for the extra info.
As for HS2, there are plenty of long tunnels that will need to be tested. I wonder if we'll get the chance to repeat the Eurostar experience?
 

D7666

Member
Joined
12 Aug 2013
Messages
997
@D7666
Thanks for the extra info.
As for HS2, there are plenty of long tunnels that will need to be tested. I wonder if we'll get the chance to repeat the Eurostar experience?
Elizabeth line did have half a dozen exercises; not sure if these were public; being staff I saw the internal advice about them. I booked on two, but, could go on neither, as they were both Sundays mornings, and I'd not checked NR engineering, we had no trains only extended journey time bus replacements, and unable to get into London on time.

HS2 almost certainly will have something but whether we'll get fires, OLE arcing, real live kettles, diesel haulage, rare track, or anything else interesting is open to question.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,779
Elizabeth line did have half a dozen exercises; not sure if these were public; being staff I saw the internal advice about them. I booked on two, but, could go on neither, as they were both Sundays mornings, and I'd not checked NR engineering, we had no trains only extended journey time bus replacements, and unable to get into London on time.
I was on one of the Elizabeth line tests. I don’t think they were open to the public but I was invited to go by a friend who works for TfL.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,877
Location
UK
I was on the Eurostar/HS1 tests in 2007. Nothing interesting happened. We only went into the first tunnel and not even as far as Stratford. No evacuation either.

We got to test departures and arrivals too then do it again and home.
 