• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

European timetables 2027

Austriantrain

Established Member
Joined
13 Aug 2018
Messages
1,786
I hope it is alright to start a general thread on news about changes/improvements to European timetables in 2027 (not precluding specific threads for individual services of course).

First two:
1. SNCF, SNCB and SBB have announced that they will run a trial weekend Brussels - Strasbourg - Basel TGV service by extending one train pair a day from Strasbourg to Basel from July 2027. According to https://news.sbb.ch/de/019e9720-8be...est-neue-verbindung-basel-strassburg-bruessel (in German), there will be a good connection to London at Lille UK-bound, but none in the other direction.

2. Provided the ETR410 get approved in time, there will be a daily Frecciarossa train pair between Rome and Munich as well as Milan and Munich, run by TI in cooperation with ÖBB and DB (https://www.deutschebahn.com/de/pre...und-Rom-mit-neuen-Direktverbindungen-13378658).

== Doublepost prevention - post automatically merged: ==

According to the Czech timetable draft (https://www.spravazeleznic.cz/cestujici/jizdni-rad/navrh-jizdniho-radu-na-rok-2027), there will be an additional Wien - Warszawa EC, closing the remaining Takt gap.

And an additional RJ Wien - Berlin.

The NJ Berlin - Graz will no longer reach Graz, but end at Wien Westbhf.

Obviously, all still at the draft stage.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

NCT

Established Member
Joined
18 Apr 2025
Messages
2,097
Location
London
Good that the Vienna - Poland takt gap is being filled. If implemented it means the state operators get there before Regiojet afterall.

The draft ZSSK timetables have the Tatrans significantly accelerated. The Zilina - Kosice paths remain unchanged but services depart Bratislava almost 30 minutes later. Suspect this marks the final benefit realisation of the Bratislava - Zilina modernisation?

According to sources the final step of testing and commissioning of ETCS level 2 on the Central Railway Line (CMK) is scheduled for next month. Will the 2027 timetable finally feature 250km/h running of the Pendolino sets?
 

Top