• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

ETH Fitted Class 31 Performance

Status
Not open for further replies.

randyrippley

Established Member
Joined
21 Feb 2016
Messages
5,382
It was a BR decision to re-engine with the EE power unit and the conversion work was done at Doncaster.

I think the EE engines were used simply used for commonality of parts with the large number already in service in the class 37 fleet. Also the design was available off-the-shelf: when the decision to make the change was made, EE were nearing the end of the class 37 and 20 production runs and probably had relatively low-cost production capacity available.
Barrow by then would have stopped building the small number of 8-cylinder Sulzers, and switched to the 6-cylinders for the later class 25.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

randyrippley

Established Member
Joined
21 Feb 2016
Messages
5,382
the 30/31 bogie would appear to be a powered version of the three-axle Commonwealth design in the bottom photo
 

Attachments

  • common.jpg
    common.jpg
    152.5 KB · Views: 28
Status
Not open for further replies.

Top