Engineering Work North of Preston this weekend?

Status
Not open for further replies.

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,279
:?: Understand that there may be rail replacement buses north of Preston this weekend. Anyone got any details? (As I can't seem to find anything on the not particularly user-friendly National Rail site!)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Crossforth

Established Member
Joined
20 Aug 2009
Messages
1,337
Location
Lancashire
All I know is that I will need to get a rail replacement bus from Penrith to Preston on Sunday <(
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,279
:? Looks like there's some rail replacement buses between Carlisle and Preston from Saturday afternoon onwards, with other services being diverted with longer journey times (presumably being routed via Appleby on the Settle & Carlisle line). But still not seen any details of what's going on anywhere!
 

43167

Member
Joined
18 Jan 2010
Messages
1,021
Location
Keighley
Theres a train at 1305 from Preston i think. But expect it will voyagers. In the northwest tomorrow so might go that way to see if theres any potential dragging.
 

boing_uk

Member
Joined
18 May 2009
Messages
619
Location
Blackburn
There was plenty of work going on across the north west yesterday. Which was a pain in the arse for me trying to get to work yesterday. Grrr.

Buses were replacing trains between Preston and Carlisle, Blackpool North, Manchester Airport and Halifax, although trains were running to Liverpool, Man Vic and Colne.

Track renewals were going on at Poulton le Fylde yesterday.... btw, does anyone know what the work is thats going on on the "redundant" part of the platforms? The edges have been stripped off and the top layers of brickwork trimmed down. Any ideas?
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,565
There was plenty of work going on across the north west yesterday. Which was a pain in the arse for me trying to get to work yesterday. Grrr.

Buses were replacing trains between Preston and Carlisle, Blackpool North, Manchester Airport and Halifax, although trains were running to Liverpool, Man Vic and Colne.

Track renewals were going on at Poulton le Fylde yesterday.... btw, does anyone know what the work is thats going on on the "redundant" part of the platforms? The edges have been stripped off and the top layers of brickwork trimmed down. Any ideas?

They are demolishing the disused part of the platform at Poulton le Fylde which will leave enough room for a 6 maybe 7 coach train when finished.



 
Last edited:

Crossforth

Established Member
Joined
20 Aug 2009
Messages
1,337
Location
Lancashire
Thats a shame. Whats the point?

If it is anything like what they have done on the Leeds- York/Selby line, it is more of an extension so they are just renewing the old part which in the case of Cross Gates meant raising the old platforms to the same level as the rest
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,565
Thats a shame. Whats the point?


There is no need for a platform that can hold a 12 coach train at Poulton anymore. The longest that calls is 6 coaches, the part of the platform that is being demolished is long disused and has been growing vegetation for years. The part of the platform that will remain in use that is being used for works access/machine store at the moment is being repaired and repaved as needed while the work is being done you'll notice that the grass 'islands' and plants are being carefully avoided.
 

boing_uk

Member
Joined
18 May 2009
Messages
619
Location
Blackburn
So what happens when its electrified and theres a remote possibility of 8 car formations? Re-extend the platform? Or just restrict the EMUs to single unit working?

Was the existing platform actually unstable/unfit requiring its demolition? Just seems like a bit of a waste of time and expense to me.
 

Chapeltom

Established Member
Joined
23 Feb 2010
Messages
1,316
Location
Tainan, Taiwan.
I think these engineering works are going on for the next few weekends. I'm supposed to be off to Morecambe on 13th March. Unfortunately National Rail indicates rail replacement buses between Lancaster & Preston for me on the way home (after 17:00)
 
Status