NRE reports that there's some engineering work between Ely and Stansted Airport over the weekend of 11-12 December. Changes to services, and details of RRBs aren't currently in the Journey Planner, just warning triangles.

But the NRE notice says this affects only Cross Country. And it's infuriatingly imprecise about just where the works are taking place. From a personal, self-interested perspective, it makes all the difference which side of Cambridge is affected!

Anyone care to offer some thoughts on this? Why are only XC services affected? Other operators run on every metre of track between Ely and the airport, so how come they aren't affected? And is it usual for NRE announcements to be so vague about the location of forthcoming works when there's a multiplicity of other operators' services which might - or might not - be caught up in the works?

Thanks in advance.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Peregrine 4903

Established Member
Joined
18 Aug 2019
Messages
1,518
Location
London
NRE reports that there's some engineering work between Ely and Stansted Airport over the weekend of 11-12 December. Changes to services, and details of RRBs aren't currently in the Journey Planner, just warning triangles.

But the NRE notice says this affects only Cross Country. And it's infuriatingly imprecise about just where the works are taking place. From a personal, self-interested perspective, it makes all the difference which side of Cambridge is affected!

Anyone care to offer some thoughts on this? Why are only XC services affected? Other operators run on every metre of track between Ely and the airport, so how come they aren't affected? And is it usual for NRE announcements to be so vague about the location of forthcoming works when there's a multiplicity of other operators' services which might - or might not - be caught up in the works?

Thanks in advance.
Because the other operators such as Greater Anglia and particularly GTR won't have had their amended timetable plans for that week finalised or published yet. Particularly with GTR, it will be probably around a month until they are.
 

Eloise

Member
Joined
14 Jan 2020
Messages
248
Location
Moving...
It's not unusual for services to be thinned rather than withdrawn completely. Some works may not be an all line block but capacity is restricted due to single line working, two-track (not in this case) or amendments to Operator A meaning they are taking up more space at Location A so Operator B decides they don't need to serve Location A. Or are told they can't.
 