Old Yard Dog
Established Member
- Joined
- 21 Aug 2011
- Messages
- 1,823
Pardon my ignorance but can anybody tell me the difference between a class 507 & a class 508 EMU? I have been travelling on Merseyrail for 35 years and still cannot tell them apart.
That article is wrong, it was the first (empty) train of the day (hence the lack of an accident report), I used to work with the driver concerned, he has quite a clear memory of it.http://www.villagematters.co.uk/shepperton-matters/2013/03/the-shepperton-train-crash
In their very early days the 508's were on the South Western division as this pic shows of a 508 parked up at Shepperton.The 455/7's have a souvenir trailer coach from the original 508 4 car set.The older drivers used to talk about these units and how good the brakes were,didn't they have rheo?
The 508's were originally intended for Merseyside like the 507 whose order had been reduced for budgetary reasons, but during construction were diverted to the Southern region to temporarily cover for the late delivery of class 455.
So was the original plan for a mix of 3 and 4-car units on Merseyside?
That article is wrong, it was the first (empty) train of the day (hence the lack of an accident report), I used to work with the driver concerned, he has quite a clear memory of it.
The day before this incident the Shepperton branch was cut off due to engineering work so they decided to use it for low adhesion trials with the 508s, To lower the adhesion available they had covered the rails in all sorts of slippery liquid but when they finished they didn't bother cleaning the rails, the result was the first train approached Shepperton running on good railhead up to that point but on encountering the contamination the train just carried on through the buffers and over the wall.
No rheo on them.
Don't think so, the plan was I think always to remove a vehicle before sending them north.
The 508's were specifically ordered for the Wirral line, honestly I don't know either way, it was the early days for the Merseyrail network (opening 1978, 508's delivered 1979). They may have intended them to form single four carriage units and then early operational experience said they should go instead for 1x3 and 2x3 formations. Its hard to imagine that cash strapped BR intentionally had dozens of carriages built which it only intended to use for two years.
Both classes *seem* to decelerate under power.
yeh agree. it feels like theyve always got the brakes on!