395 Olympic Javelin
Member
- Joined
- 18 Jun 2007
- Messages
- 120
Does anyone know when the first EMT HST will be in the new livery
when EMT send 158s for refurbs, we are (supposed) to be getting 180s temporarily. The EMT 158 fleet is in a mess, we have exTPE, CT, wessex alphaline, and SWT 158s, still in all their previous liveries!
when EMT send 158s for refurbs, we are (supposed) to be getting 180s temporarily. The EMT 158 fleet is in a mess, we have exTPE, CT, wessex alphaline, and SWT 158s, still in all their previous liveries!
I think so.
At least when the Tories privatised things, they were honest and open about their intentions, but with this current regime, they like to keep things quiet and stealthy.
I think another part of the problem is that the length of franchises is so short. No company is going to invest a lot of money in a franchise that it could lose after seven or ten years. The frachise needs to be long enough for a company to reap some of the fruits. How about a twenty or thirty year franchise, with a review every five years to see if things are coming up to scratch, and appropriate action taken to remedy things if not satisfactory, up to and including losing the frachise early?
Apologies if i've gone a little off topic.
If you believe that you will believe anything, a franchise (excluding premium payments) is pretty much without risk, the stations belong to Network Rail, the stock belongs to the ROSCOs, so the financial cost of new stock is minimal and even then the cost of the investment is covered by the ROSCO and paid back over the life of the asset, even if outside of the franchise.
Any new services or stations are a trial for 5 years I think anyway, so even if Network Rail or the ROSCOs charge a premium for the required assets, even with long franchises the premium will still be charged as the risk of the service or station becoming obsolete still remains at 5 years.
The longer franchise argument only comes into play in reality with a vertically intergrated railway, but we dont have this in this country
I know this might sound stupid, but if SWT is anything to go by, Stagecoach's way of dealing with things is to get lots of older stock, and spend money bringing it up to standard. The Desiros were needed to make up for the loss of slam door trains that had to go.
If their work on the 158/9's and the 455's is anything to go by, you will end up with some decent trains without them replacing them.
The story I've been told about refurbishment on the Meridians that the shorter ones (4/5 car ones) will be put into 2+3 seating. IMO I don't like the idea.
I know this might sound stupid, but if SWT is anything to go by, Stagecoach's way of dealing with things is to get lots of older stock, and spend money bringing it up to standard. The Desiros were needed to make up for the loss of slam door trains that had to go.
If their work on the 158/9's and the 455's is anything to go by, you will end up with some decent trains without them replacing them.
Also, remember the Dft will be announcing the new trains they pledged last year soon. Where are these going? Maybe EMT might get some new trains, probably not, but it might move some trains from other parts of the network there!!
The class 442s are power door units, with 1 slam door in the guards van area. This I believe is being removed with introduction to Southern.Were the "Pigs" slam door or power door? Forgive my lack of knowledge as regards this, but aren't they being transferred for use elsewhere on the Southern? And weren't they universally liked? So why replace them?