• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

EMR Regional and Connect refurbishments

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

trentside

Established Member
Joined
14 Aug 2010
Messages
3,393
Location
Messroom
Odd things seem to have been missed from the contract, such as cleaning the ceilings of the 170s :)

The 360s look quite high quality, but as they've chosen a very thick backed seat in the LEAN it will be interesting to see how much legroom there is. It looks like the layout is as per the 350/1, if they have done that then the legroom will be original-158 levels of poor.

The 170 ceilings was fed back after the first units returned to traffic and are now being done. There were a few other cosmetic tweaks too, such as cleaning and painting the cab desks. 501/502/503 are the ones before those changes were made.
 

Top