• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

EMR Class 360's

Status
Not open for further replies.

221101 Voyager

Established Member
Joined
17 Nov 2019
Messages
1,423
Location
Milton Keynes
I think it is flexible but not too sure - I’m guessing it’s all dependent on the 720s entering service. I can imagine leases on the 360s with GA don’t have long left though, not to mention I don’t see as many 360s out as I used to (transfers to EMR aside).
Ok, I reckon leases will run out before May 2021 as EMR want them for the new timetable.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

43096

On Moderation
Joined
23 Nov 2015
Messages
18,722
I think it is flexible but not too sure - I’m guessing it’s all dependent on the 720s entering service. I can imagine leases on the 360s with GA don’t have long left though, not to mention I don’t see as many 360s out as I used to (transfers to EMR aside).
I'd be surprised if DfT would want/allow a newly electrified route to go live with no electric trains. There's also the fact that the 360s are essential for removing the non-PRM compliant HSTs from service. Going beyond next May (i.e. 17 months beyond the PRM deadline) would be hard to justify.
 

221101 Voyager

Established Member
Joined
17 Nov 2019
Messages
1,423
Location
Milton Keynes
I'd be surprised if DfT would want/allow a newly electrified route to go live with no electric trains. There's also the fact that the 360s are essential for removing the non-PRM compliant HSTs from service. Going beyond next May (i.e. 17 months beyond the PRM deadline) would be hard to justify.
Good points.

@OTRail

To anyone interested, here's my capture of todays -5Q60 2030 Northampton Emd to Ilford E.M.U.D. 360117 move.
 

43055

Established Member
Joined
8 Mar 2018
Messages
3,677
Ok, I reckon leases will run out before May 2021 as EMR want them for the new timetable.
They will need to have time to be prepared for service at EMR so all of them would probably be over before May.

As the May changes were meant to happen in December i would imagine leases will be with EMR soon and then the remaining units are then leased to GA.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
They will need to have time to be prepared for service at EMR so all of them would probably be over before May.

As the May changes were meant to happen in December i would imagine leases will be with EMR soon and then the remaining units are then leased to GA.
The lease transferred to EMR on 31 August, it’s in the GA franchise agreement.
 

OTRail

Member
Joined
14 Jul 2019
Messages
529
The lease transferred to EMR on 31 August, it’s in the GA franchise agreement.
So they’re subleased to GA at the moment I presume?

== Doublepost prevention - post automatically merged: ==

I'd be surprised if DfT would want/allow a newly electrified route to go live with no electric trains. There's also the fact that the 360s are essential for removing the non-PRM compliant HSTs from service. Going beyond next May (i.e. 17 months beyond the PRM deadline) would be hard to justify.
That’s true - the Corby service was meant to start next month, with all HSTs subsequently withdrawn. That hasn’t happened and despite the derogation, EMR are really feeling the pressure to remove their HSTs from service by May 2021...
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
So they’re subleased to GA at the moment I presume?
I think that‘s been the usual result when some transfer or other turns out to be impossible. Seems sometimes that such delays are more likely than the original planned dates...
 

F Great Eastern

Established Member
Joined
2 Apr 2009
Messages
3,846
Location
UK
Well the 321/322s that will cover the 360 duties are not going to hit the MTIN that the 360s did or near it, so that means you're not going to be able to simply do a like for like replacement of a 360 with a 321 without needing to use a few more units daily that will be in theory be maintenance spares every day.

Saying that with the current suppression of demand, even when taking into account the inferior reliability of the other EMU units, with the 720s on the way and the fact there's been some 321/322s brought in, you'd hope GA wouldn't have any real shortages unless the MTIN of those 321/322s falls away more.
 

samuelmorris

Established Member
Joined
18 Jul 2013
Messages
5,121
Location
Brentwood, Essex
Well the 321/322s that will cover the 360 duties are not going to hit the MTIN that the 360s did or near it, so that means you're not going to be able to simply do a like for like replacement of a 360 with a 321 without needing to use a few more units daily that will be in theory be maintenance spares every day.

Saying that with the current suppression of demand, even when taking into account the inferior reliability of the other EMU units, with the 720s on the way and the fact there's been some 321/322s brought in, you'd hope GA wouldn't have any real shortages unless the MTIN of those 321/322s falls away more.
You say that, but the "native" 321s aren't bad as MTIN figures go, certainly better than the 720s are likely to achieve for a long time.
 

GNS

New Member
Joined
30 Jun 2020
Messages
3
Location
Kettering
Might go and watch the 360 arrive at Kettering Stabling on Thursday. I see RTT has 360 movements between Kettering Stabling and Kentish Town beginning 14 December and continuing well into the new year Sorry if I'm telling you something you already know.
 

Journeyman

Established Member
Joined
16 Apr 2014
Messages
6,295
That's Andrew Gwilt. He comments on virtually every railway related article on the internet with his list of fantasies that he wants to happen

...along with repeating everything that's in the article in the first place! He gets around...a lot.
 

D_MTrains

Member
Joined
12 Jul 2020
Messages
38
Location
Kettering
Might go and watch the 360 arrive at Kettering Stabling on Thursday. I see RTT has 360 movements between Kettering Stabling and Kentish Town beginning 14 December and continuing well into the new year Sorry if I'm telling you something you already know.
I am assuming this means that the testing of the OHLE is completed? Was certainly nice seeing 91s up here while it lasted.
 

colchesterken

Member
Joined
12 Oct 2010
Messages
768
Saw a 720 on test ( I assume ) yesterday at East Gate looks like Colchester to Clacton 1420 on RTT
Do they have 720 staying up here at Colchester or Clacton or do they go home to Ilford for a check up after a day out
 

43055

Established Member
Joined
8 Mar 2018
Messages
3,677

johnw

Member
Joined
22 May 2013
Messages
176
Any news that Wellingborough and Kettering will get a reduction in the intercity fares charged when this downgrade of a service is introduced?
 

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,291
Location
South West London
Any news that Wellingborough and Kettering will get a reduction in the intercity fares charged when this downgrade of a service is introduced?

Is it really a downgrade? The 360s are getting fully refurbished to IC standards, so 2+2 in Standard and 2+1 in First. You’ll be getting up to 12 carriages at peak time too. To me, it seems like an upgrade, so by your logic you should be paying more!
 

OTRail

Member
Joined
14 Jul 2019
Messages
529
Yes, three!
(I don’t do numbers, sorry).
No worries, was asking for the numbers!

== Doublepost prevention - post automatically merged: ==

Well it was on the wiki 360 page for a couple of days, thanks to someone’s vivid imagination. No evidence whatsoever of course...
As always...

Saw the /2s at OOC the other week with their pans down and switched off for the first time, guess we’ll be finding out their future soon...
 
Status
Not open for further replies.

Top